Underwater production machine with hydro-turbine drive

Authors:
A. V. Shalygin
About authors
  • Student, research assistant G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2001-06-19
Date accepted:
2001-07-13
Date published:
2002-03-14

Abstract

An underwater mining machine is designed to collect nodules from the surface of the seabed at a depth of 60-80 m. The technological process of underwater mining usually contains independent actions: separation from the mass, collection and transportation of minerals. The controlled actuator of the underwater mining machine does not guarantee simultaneous rotation and movement; however, it operates with high stability. The operating stability of such a drive is improved by introducing a rigid kinematic coupling between the feeding and cutting parts, when the solid mechanical characteristic of the cutting part is not less than that of the feeding part. The introduction of a rigid kinematic coupling allows the hydraulic turbine not to stop in case of an array with a different resistance. Such a condition is not satisfied if a hydraulic turbine drive is used as the main drive, but is guaranteed when a volumetric hydraulic drive is used. When the soft mechanical characteristic of the cutting part and the hard mechanical characteristic of the feeding part are combined, the hydraulic turbine stops (the displacement pump drive of the hydraulic drive rotates at a constant angular velocity). In order to stabilize the operating energy at maximum power, it is necessary to ensure the regulation of the hydraulic drive of the feed mechanism.

Область исследования:
(Archived) Mining electromechanics
Go to volume 150

Similar articles

Optimization of slurry separation processes using LAROX OY press filters
2002 V. O. Golubev
Phylogeny and developmental phases of the Campanian-Maastrichtian foraminifers of the Baltic region
2002 E. B. Dmitrieva
Design and research of hydraulic drive for underwater drilling of exploration wells
2002 S. V. Kazakov
Analysis of deformation and calculations of the stability of the embankment of the Petrovsky stadium
2002 E. G. Zakharova
Mineralogical and geochemical features and staging of Au-Sb-W mineralization of Verkhne-Yenashiminskoye ore cluster deposits (Yenisei Ridge, Siberia)
2002 A. A. Savichev, S. P. Nagaeva
Simulation of a vertical hydraulic transport system with a submerged capsule
2002 I. A. Chilikin