The method of re-conservation of temporarily non-working pit wall in two stages with the formation of a bulk prism

Authors:
T. N. Donchenko
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2001-07-04
Date accepted:
2001-08-14
Date published:
2002-05-20

Abstract

The article considers one of the most acute problems of open pit mining - the resumption and development of mining operations on temporarily non-working sides of the open pit. The impossibility of timely and full-scale solution of this problem by the majority of enterprises due to spontaneous creation of temporarily non-working faces and difficult economic situation is emphasized. In order to prevent reduction of the limits of open-pit mining and deterioration of performance of enterprises, the need to develop cost-effective ways of re-conservation of temporary faces adapted to the current situation in the national economy and mining industry is justified. A new effective method of pillar re-preservation using artificial creation of the bottom part of the pillar - bulk prism from the blasted rock mass is proposed which allows to reduce considerably (up to 60%) the scope of work to place the temporarily non-working pillar of the open pit in the working position and to increase the speed of its re-preservation. The high efficiency of the proposed method of re-conservation of temporarily non-working sides at the expense of explosive movement of a certain part of rock mass necessary for construction of a bulk prism is noted. The used order of works is described. On the basis of geometric analysis and comparison of costs of rock mass excavation by different methods the economic efficiency of re-conservation of temporarily non-working sides with the formation of a bulk prism is determined. Dependencies allowing to determine optimal parameters of the bulk prism on the basis of the condition of achieving the maximum economic effect are given.

Область исследования:
(Archived) Development of mineral deposits
Go to volume 150

Similar articles

Effective boundaries of chamber-and-pillar development system options
2002 V. V. Fitsak
The main problems of improving the efficiency of complex production of aluminum industry
2002 N. V. Perlinen
Study of oil and gas offshore oil and gas dispersion halos
2002 N. A. Kasyankova, T. V. Lavrenova
Traceability of a flexible articulated pipeline in an aqueous environment
2002 M. L. Kabanov
Instrumental support for the operation of organizational and management systems
2002 A. F. Gershberg
Methodology for determining the prices of scientific and technical products
2002 A. K. Al-Zubi