Submit an Article
Become a reviewer
Vol 151
Pages:
87-89
Download volume:

Technological and technical solutions to improve well construction quality and productivity

Authors:
N. I. Slyusarev1
K. Yu. Belyugov2
A. I. Usov3
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining University
  • 2 — G.V. Plekhanov Saint Petersburg Mining University
  • 3 — G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2001-08-25
Date accepted:
2001-09-28
Date published:
2002-03-01

Abstract

The main task of the research was to select formulations of plugging compositions, providing formation of wellbore structures in the productive formation by artificial filters with specified properties. Despite the urgency of the problem, no special plugging materials have been created for this purpose. A polyurethane hydrophilic pre-polymer curing only in the presence of water has been tested as a raw ingredient for the binder. Hydrate-free salts were used as soluble fillers, and building sand served as a filler. The strength characteristics were determined by the compressive stress at a strain of 10%, the ultimate strength and permeability depending on the component composition according to the Gibbs-Rosembaum diagram. It is shown that the permeability of plugging stone increases with the increasing volume of erosible substance, and if the volume of erosible substance is equal, the permeability decreases with the increasing fraction of the filler, but the strength properties do not change much. The carried out researches testify to the technical possibility of creation of face design with the set parameters of strength, permeability and wettability when opening the unstable oil reservoir.

Go to volume 151

Similar articles

Some Issues of Improving the Oil and Gas Prospecting Process (Based on an Analysis of Exploration Activities in the Russian Federation in 1996-2000)
2002 I. I. Martynova
Prospects for offshore drilling from monopods
2002 S. S. Khvorostovskii, A. N. Pronkin
Forming a corporate development strategy for the company
2002 A. Yu. Osipov
Development of principles for building an integrated system of operational monitoring of water bodies and hydraulic structures
2002 A. A. Kalmykov, V. I. Elfimov
Borehole geophysical computer technology for identifying undeveloped areas of oil deposits
2002 P. V. Kondratenko
Analysis of the financial condition of the Kaliningrad Maritime Drilling Works Administration
2002 E. N. Kurilovich