Submit an Article
Become a reviewer
Vol 151
Pages:
87-89
Download volume:
RUS
Article

Technological and technical solutions to improve well construction quality and productivity

Authors:
N. I. Slyusarev1
K. Yu. Belyugov2
A. I. Usov3
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining University
  • 2 — G.V. Plekhanov Saint Petersburg Mining University
  • 3 — G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2001-08-25
Date accepted:
2001-09-28
Date published:
2002-06-10

Abstract

The main task of the research was to select formulations of plugging compositions, providing formation of wellbore structures in the productive formation by artificial filters with specified properties. Despite the urgency of the problem, no special plugging materials have been created for this purpose. A polyurethane hydrophilic pre-polymer curing only in the presence of water has been tested as a raw ingredient for the binder. Hydrate-free salts were used as soluble fillers, and building sand served as a filler. The strength characteristics were determined by the compressive stress at a strain of 10%, the ultimate strength and permeability depending on the component composition according to the Gibbs-Rosembaum diagram. It is shown that the permeability of plugging stone increases with the increasing volume of erosible substance, and if the volume of erosible substance is equal, the permeability decreases with the increasing fraction of the filler, but the strength properties do not change much. The carried out researches testify to the technical possibility of creation of face design with the set parameters of strength, permeability and wettability when opening the unstable oil reservoir.

Область исследования:
(Archived) Organizational and managerial solutions to improve oil recovery methods
Go to volume 151

Similar articles

Borehole geophysical computer technology for identifying undeveloped areas of oil deposits
2002 P. V. Kondratenko
Preparation of the information field for the analysis of production costs of a geological enterprise
2002 O. S. Ivanova
On the prospect of creating wellbore gravimeters based on film accelerometers
2002 A. A. Molchanov, K. M. Ermokhin, S. K. Zaburdin
Development of principles for building an integrated system of operational monitoring of water bodies and hydraulic structures
2002 A. A. Kalmykov, V. I. Elfimov
Improvement of technological regimes of oil reservoirs and wells operation for the conditions of the Zapadno-Poludennoye field
2002 N. I. Slyusarev, T. V. Kiyashko, V. V. Voronin
Organization of work on control of directional and horizontal oil and gas wells in Western Siberia
2002 A. A. Saraev