Submit an Article
Become a reviewer
Vol 152
Pages:
199-201
Download volume:
RUS
Research article
Metallurgy

Development and research of a method for separating nickel and copper in solutions

Authors:
P. N. Devyatkin
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2001-09-20
Date accepted:
2001-10-27
Date published:
2002-08-26

Abstract

The method of nickel and copper separation in the processing of wastewater containing nickel and copper trace elements has been developed and investigated. The method provides collective foam flotation extraction of nickel and copper by naphthenic acid solution in kerosene with subsequent selective re-extraction of nickel from the obtained organic phase of the foam product. The optimum conditions for selective re-extraction were determined: temperature 70 °C and pH = 375-425 Under these conditions the partition coefficient of nickel and copper reaches 140-145, which makes it possible to obtain after crystallization commercial nickel sulfate corresponding to the copper content in grade Ch of GOST 4465-74.

Девяткин П.Н. Разработка и исследование способа разделения никеля и меди в растворах // Записки Горного института. 2002. Т. 152 . С. 199-201.
Devyatkin P.N. Development and research of a method for separating nickel and copper in solutions // Journal of Mining Institute. 2002. Vol. 152 . p. 199-201.
Go to volume 152

References

  1. Дибров И.А. Классификация флотационных процессов в гидрометаллургии и очистке сточных вод / И.А.Дибров, Н.Н.Воронин, А.А.Клемятов // Обогащение руд. 1999. № 5.
  2. Берестовой А.М. Экстракция цветных металлов из растворов нафтеновой кислотой / А.М.Берестовой, О.Л.Белькова, В.Д.Демидов // Известия вузов. Цветная металлургия. 1985. № 2.

Similar articles

Synchronous-synphase mode of operation of a vibrating jaw crusher with non-rigid mounting of vibrating exciters
2002 E. V. Shishkin
Mathematical model of a flexible pipeline for lifting minerals from the seabed surface
2002 B. S. Makhovikov, M. L. Kabanov
Geomechanical justification of stability of mine workings and wells in visco-plastic massifs
2002 N. S. Kononova
Development of methods for crossing the emission hazardous zones when excavating the third potash layer of the Starobinskoye deposit at full capacity
2002 Yu. G. Sirenko, E. R. Kovalskii
The choice and justification of methods for calculating the parameters of massif elements when dissolving salt in mining and geological conditions of mining domed deposits
2002 O. V. Kovalev, S. P. Mozer
Temporal and spatial variability of Au-Sb-W mineralization in the Verkhne-Yenashinskoye Ore Cluster (Yenisei Ridge, Siberia)
2002 A. A. Savichev