Submit an Article
Become a reviewer
Vol 152
Pages:
92-94
Download volume:
RUS
Article

Determination of the optimal volume of technogenic reserves ready for excavation of a tailings dump on the basis of statistical data. Notes of the Mining Institute

Authors:
G. A. Kholodnyakov1
E. B. Gridina2
About authors
  • 1 — Associate Professor G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2001-09-17
Date accepted:
2001-10-13
Date published:
2002-08-26

Abstract

The high profitability of open development of technogenic deposits is proved; on the basis of statistical data, the optimum volume of technogenic reserves ready for excavation of the tailings dump is established. When solving the problem set in the form of a statistical model, the analysis of random values with the conditional distribution function has been carried out and the solution regarding some a priori distribution of states of the mining and technical system minimizing the expected value of the loss function has been obtained. The necessity of increasing the accuracy, efficiency and reliability of design decisions in conditions of the market model of economy, the stochastic nature of the initial data is substantiated. It is shown that the development of man-made deposits at the achieved level of technology can become very cost-effective. On the basis of the Bayesian function, a general expression for the optimal amount of reserves accumulated in a technogenic deposit is obtained. The calculation is made on the example of raw materials accumulated in the tailings pond. The proposed methodology is applicable to technogenic deposits of any class.

Область исследования:
(Archived) Development of mineral deposits
Go to volume 152

Similar articles

Geomechanical justification of parameters of the development system of a thick steep layer in the case of sub-stage hydraulic extraction
2002 V. P. Zubov, A. A. Sidorenko, E. V. Glushenkov
Development of methods for crossing the emission hazardous zones when excavating the third potash layer of the Starobinskoye deposit at full capacity
2002 Yu. G. Sirenko, E. R. Kovalskii
The choice and justification of methods for calculating the parameters of massif elements when dissolving salt in mining and geological conditions of mining domed deposits
2002 O. V. Kovalev, S. P. Mozer
Ways to improve thin seam mining technology at Vorkutaugol mines
2002 V. A. Bykov
The state of tree species of Pushkin
2002 A. M. Polochanina, V. F. Kovyazin
Impact of roasting and leaching on changes in the phase composition of the main components of copper electrolyte slurry
2002 A. Ya. Boduen