Submit an Article
Become a reviewer
Vol 152
Pages:
66-70
Download volume:
RUS
Article

Improving the efficiency of plowing systems when developing formations with unstable gripping wall

Authors:
V. P. Zubov1
S. V. Vasilev2
D. V. Pakhomov3
About authors
  • 1 — Professor G.V. Plekhanov Saint Petersburg State Mining Institute
  • 2 — Associate Professor G.V. Plekhanov Saint Petersburg State Mining Institute
  • 3 — Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2001-09-26
Date accepted:
2001-10-18
Date published:
2002-08-26

Abstract

A method for controlling the rock mass condition for the working faces using jetting units under unstable roof conditions has been developed. The necessity of increasing the rate of advance of the working face and the use of backfill of the mined-out space to ensure rock stability and uniform loading of the edge part of the formation has been proved. A formula for calculating the critical value of the filling mass suppression, which takes into account the caving step of the main roof, the loosening ratio, the thickness of the immediate roof rocks and can determine the compression properties of the filling mass by modern methods, taking into account the rate of advance of the face and the size of the squeeze zone, has been proposed. The proposed methodology substantiates an increase in the rate of face advance up to 4-6 m/day and the load on the working face by 30%.

Область исследования:
(Archived) Development of mineral deposits
Go to volume 152

Similar articles

Formation of an active receivables management policy at a mining enterprise (on the example of OAO Olkon)
2002 A. M. Vdovichenko, V. V. Vinogradova
Geotechnical and geoecological analysis of the causes of deformation of some architectural and historical monuments in St. Petersburg (on the example of St. Isaac's Cathedral)
2002 O. Yu. Aleksandrova
The choice and justification of methods for calculating the parameters of massif elements when dissolving salt in mining and geological conditions of mining domed deposits
2002 O. V. Kovalev, S. P. Mozer
Identification of parameters of the fuzzy control system of the gas mode of a horizontal converter
2002 A. S. Anashkin
Development and research of a method for separating nickel and copper in solutions
2002 P. N. Devyatkin
The impact of the energy of dynamic phenomena on the character of fracture of mine workings
2002 O. V. Kolosova