Submit an Article
Become a reviewer
Vol 152
Pages:
63-65
Download volume:
RUS
Article

Ways to improve thin seam mining technology at Vorkutaugol mines

Authors:
V. A. Bykov
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2001-09-12
Date accepted:
2001-10-29
Date published:
2002-08-26

Abstract

The analysis of the current state of thin seam mining technology in the mines of OAO Vorkutaugol has been performed. On the example of the Pyaty layer of the Vorkuta field, the main factors restraining the development of mining operations in thin seams have been identified, and proposals for improving the technology have been developed. The experience of applying the combine and plow technologies in the direction of the face moving both on the dip and on the strike is described. On the basis of the experience of mining the Pyaty layer it is shown that mining thin seams by long poles along the strike has a number of advantages compared to the mining along the dip. These advantages are connected with better loading of the waste coal on the conveyor, as well as more favorable mode of the longwall conveyor. It is also shown, that the preparation workings should be carried out with undermining of the seam ground to prevent excessive bending of the face conveyor transition section at the junction. It is concluded that the correct engineering analysis of the decisions on the choice of all technology elements can ensure a stable daily load on the thin seam face at the level of 1200 tons.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 152

Similar articles

"Ratio Studiorum” and the paradoxes of Jesuit education
2002 D. V. Shmonin
Temporal and spatial variability of Au-Sb-W mineralization in the Verkhne-Yenashinskoye Ore Cluster (Yenisei Ridge, Siberia)
2002 A. A. Savichev
The impact of the energy of dynamic phenomena on the character of fracture of mine workings
2002 O. V. Kolosova
Forecasting the service life of loading and unloading machine elements on the basis of determining their operational load
2002 A. A. Kuleshov, E. A. Grigorev
The problem of implementing the concept of sustainable development in subsoil use
2002 N. G. Ershova
Determination of the optimal volume of technogenic reserves ready for excavation of a tailings dump on the basis of statistical data. Notes of the Mining Institute
2002 G. A. Kholodnyakov, E. B. Gridina