Monitoring of hydrogeomechanical processes in the emergency section of the St. Petersburg subway
About authors
- 1 — VNIMI
- 2 — VNIMI
- 3 — VNIMI
- 4 — VNIMI
Abstract
The hydrodynamic regime is monitored by 90 hydrostatic pressure sensors placed at different depths in the heterogeneous thickness of quaternary deposits. Total, neutral and effective stresses along the route of projected tunnels were determined. Seasonal changes of hydrostatic pressures in the thickness and their connection with atmospheric pressure are estimated. The reaction of water-saturated massif to tunneling with bottom-hole hydroloading has been fixed.
Область исследования:
(Archived) Modern problems of geotechnical and hydrogeological surveys
Funding:
None
Similar articles
Regularities of soil moisture changes in the Southern Urals
2003 E. N. Skvaletskii, O. A. Golubnichaya
Challenges of engineering and geological research of the territory of Irkutsk
2003 I. I. Verkhozin, A. V. Samusenko, S. P. Nikiforov
Issues in the development of engineering-geological stratification and geological space partitioning models in engineering geology
2003 M. S. Zakharov