Monitoring of hydrogeomechanical processes in the emergency section of the St. Petersburg subway
About authors
- 1 — VNIMI
- 2 — VNIMI
- 3 — VNIMI
- 4 — VNIMI
Abstract
The hydrodynamic regime is monitored by 90 hydrostatic pressure sensors placed at different depths in the heterogeneous thickness of quaternary deposits. Total, neutral and effective stresses along the route of projected tunnels were determined. Seasonal changes of hydrostatic pressures in the thickness and their connection with atmospheric pressure are estimated. The reaction of water-saturated massif to tunneling with bottom-hole hydroloading has been fixed.
Область исследования:
(Archived) Modern problems of geotechnical and hydrogeological surveys
Similar articles
Current state and problems of geotechnical surveys for hydraulic engineering
2003 V. O. Istochnikov, S. V. Kriventsov
Engineering-geological and geoecological studies of the impact of operational factors on the stability of civil and industrial structures
2003 R. E. Dashko, L. P. Norova