Abstract

Modern problems of designing power supply systems are considered. The method of constructing load maps using the method of potential functions and the method of determining the most profitable number of power substations using the target function are shown. The results of constructing the load chart with the use of software package MathCAD 2001 are presented. The optimal number of electric power substations is determined by the given target function of expenses. The method of choosing the variant with the optimal number of electric power substations and constructing two-dimensional image of potential function of receivers loads for this variant. Recommendations on the selection of optimal locations of electrical substations and the optimal allocation of electric consumers to individual electrical substations are given. The necessity of using modern software in the design of power supply systems was substantiated.

Область исследования:
(Archived) Mining electromechanics
Go to volume 155

Similar articles

Creating an electronic guide to the Pascal programming language
2003 A. M. Smirnov
Gas transportation automatic control system
2003 N. Yu. Tropinova
Specifics of the development of complex coal deposits
2003 N. V. Kosenko
The application of the balanced scorecard in the mining enterprise
2003 V. V. Vinogradova
Assessment of the impact of dust and gas clouds on the environment during blasting operations
2003 O. V. Tikhonova
Analysis of the system of state administration of subsoil use in the Russian Federation
2003 L. I. Iseeva, A. V. Zelenov