Abstract

Modern problems of designing power supply systems are considered. The method of constructing load maps using the method of potential functions and the method of determining the most profitable number of power substations using the target function are shown. The results of constructing the load chart with the use of software package MathCAD 2001 are presented. The optimal number of electric power substations is determined by the given target function of expenses. The method of choosing the variant with the optimal number of electric power substations and constructing two-dimensional image of potential function of receivers loads for this variant. Recommendations on the selection of optimal locations of electrical substations and the optimal allocation of electric consumers to individual electrical substations are given. The necessity of using modern software in the design of power supply systems was substantiated.

Область исследования:
##submission.archive.categories## Mining electromechanics
Go to volume 155

Similar articles

Challenges of increasing the efficiency of OAO Vorgashorskaya Mine
2003 D. A. Savinov
Results of the study of physical and mechanical properties of polymer-cement compositions with low content of dispersion medium
2003 R. R. Toib, F. A. Zagrivnyi, Piter L.Mvansa
Experimental studies of the effectiveness of biological treatment of oil-contaminated soils
2003 E. A. Sinkova
Reduction of sulfur dioxide emissions during blasting operations at pyrite mines
2003 V. I. Chernobai
Determination of the optimal degree of crushing of blasted rock mass for crushed stone quarries
2003 E. N. Kuksa
Regression model of mechanical drilling speed of fractured rocks
2003 Mpezo Mavambo