Determining the coordinates of the location and number of electrical substations at the industrial site of the mining enterprise

Authors:
A. V. Krivenko
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2002-06-02
Date accepted:
2002-07-22
Date published:
2003-12-08

Abstract

Modern problems of designing power supply systems are considered. The method of constructing load maps using the method of potential functions and the method of determining the most profitable number of power substations using the target function are shown. The results of constructing the load chart with the use of software package MathCAD 2001 are presented. The optimal number of electric power substations is determined by the given target function of expenses. The method of choosing the variant with the optimal number of electric power substations and constructing two-dimensional image of potential function of receivers loads for this variant. Recommendations on the selection of optimal locations of electrical substations and the optimal allocation of electric consumers to individual electrical substations are given. The necessity of using modern software in the design of power supply systems was substantiated.

Область исследования:
(Archived) Mining electromechanics
Funding:

None

Go to volume 155

Similar articles

Calculation algorithm of layered massif to predict the stress state of the roof and the coal seam in the zone of mining operations
2003 A. P. Gospodarikov, S. V. Vasilev, M. A. Zatsepin
Assessment of investment risk in the oil industry when designing the development of oil fields of poorly explored areas
2003 M. A. Lazarenko
Problems and prospects for Gazprom's development in the context of the formation of the Pan-European gas market
2003 A. E. Savchenko
Taimyr District Center for Folk Art
2003 V. Yu. Paniot
Determination of dimensions of artificial pillars in the ascending two-stage chamber mining system
2003 D. Yu. Minaev
Optimization of open-pit mining of the Khoilinskoe barite deposit based on computer modeling
2003 I. V. Apukhtina