Optimization of open-pit mining of the Khoilinskoe barite deposit based on computer modeling

Authors:
I. V. Apukhtina
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2002-06-01
Date accepted:
2002-07-03
Date published:
2003-01-01

Abstract

Volumetric model of the ore body of Khoilinskoe barite deposit was built using Micromine software, which was used as a basis for computer modeling of options for open-pit mining of the deposit. Taking into account the design parameters of the existing open pit (the height of the overburden 5 m, the height of the repayment berm 15 m, the slope of the repayment berm 50°) its volume model was built, on the basis of which the volumes of extracted rock mass, ore were estimated and the average stripping ratio was calculated (19.7). A similar model was built for the prospective variant of the open pit, for which, taking into account new data on physical and mechanical properties of rocks, it became possible to increase the slope of the pit walls to 60° and the height of the repayment benches to 30 m. Calculated by the new model overburden ratio was 14.7, which will reduce the total volume of overburden by 1493 thousand m 3 .

Go to volume 155

References

  1. Юшкин Н.П. Бариты Уральско-Пайхойской провинции / Н.П.Юшкин, А.Ф.Куни, Т.И.Таранина. Екатеринбург: УрО РАН, 2002. 339 с.
  2. Хохряков В.С. Открытая разработка месторождений полезных ископаемых. М: Недра, 1991. 361 с.

Similar articles

On the origins and formation of administrative justice in Russia
2003 D. R. Kayumov
Geomechanical justification of methods and means to ensure the stability of preparatory workings in zones of high rock pressure in layered massifs
2003 D. I. Raevskii
Methodology for predicting the anthropogenic regime of groundwater during mine flooding
2003 K. N. Shcherbich
Assessment of environmental and conflict competitive risk in the diamond mining industry
2003 A. V. Smetankin
The influence of technology on the formation of the load during the construction of the column station of the St. Petersburg Metro "Komendantsky Prospekt"
2003 P. A. Demenkov
Improvement of deep vertical shaft reinforcement