Calculation of temperature and pressure changes along the length of the oil pipeline during start-up and shutdown

Authors:
P. V. Pyatibrat
About authors
  • Ukhta State Technical University
Date submitted:
2002-07-27
Date accepted:
2002-08-23
Date published:
2003-12-30

Abstract

Operation of an oil pipeline with heating has its own specifics and is manifested, first of all, in the influence of pipeline heat exchange conditions with the environment on oil properties. Oil pipeline condition largely determines the technology, design and engineering solutions of oil pipeline, preservation of natural environment, as well as the choice of operating regimes. At the same time, it is required to actively manage the thermal condition of oil pipeline. Approximate formulas are known for solution of a great number of such tasks as prediction of heat and hydraulic regimes in conditions of changing operating parameters, which does not reflect the real situation accurately enough and does not satisfy the solution of the tasks set. The proposed forecasting methods most fully meet the temporal requirements.

Область исследования:
(Archived) Mining electromechanics
Go to volume 155

Similar articles

Optimization of oil and petroleum product pumping regimes in pipelines with intermediate pump stations using variable speed pumps
2003 A. P. Tumanskii
Development of principles for designing an oil spill response system based on the example of developing the Piltun-Astokhskoye field on the Sakhalin continental shelf
2003 A. A. Termateosov, R. E. Monakhov, Z. A. Minin
Bacterial leaching of pyrrhotite concentrate for the most complete extraction of base and noble metals
2003 V. V. Pustovalov
Improvement of the circular heating furnace design scheme by reducing heat losses through the closed loop heating zone
2003 P. S. Chesnokov
Analysis of the smelting process in the vanyukov furnace to increase the extraction of the sum of non-ferrous metals
2003 I. A. Kirpichenkov
Russia Bunker method of rock mass reloading in open pits
2003 N. S. Avraamova