Submit an Article
Become a reviewer
Vol 155 No 2
Pages:
120-122
Download volume:
RUS
Research article
Mining electromechanics

Assessment of damage from hazardous emissions at open-pit mining operations during the operation of diesel mining and transportation equipment

Authors:
V. N. Pavlov
About authors
  • G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2002-07-08
Date accepted:
2002-08-10
Date published:
2003-02-01

Abstract

Due to the unsatisfactory environmental situation in the areas of mining complexes, special attention should be paid to environmental safety when selecting equipment. The results of the calculation of the transportation complex on the example of Udachny open pit of ALROSA's diamond mining company are presented. A quantitative assessment of damage associated with equipment downtime is made. A total of five different options have been considered, four of which use different ways to reduce the harmful effects from the operation of diesel dump trucks. The most economical variant, which allows to reduce not only harmful impact, but also the cost of transportation of rock mass, is determined.

Go to volume 155

References

  1. Шешко О.Е. Сравнение карьерных транспортных комплексов по показателям экологичности // Горные машины и автоматика. 2002. № 1.
  2. Рогалев В.А. Нормализация атмосферы горнорудных предприятий. М.: Недра, 1993.

Similar articles

Environmentally friendly technologies for disintegrating clay sands in the development of gold and platinum deposits
2003 A. V. Karepanov
Development of a device for combustion of fuel oil and gas mixture
2003 V. V. Kanenkov
Expansion of filter zones of hydrogeological and water wells
2003 K. S. Goidenko
Optimization of the technological process of zinc electrolysis in sulfate solutions by simulation experiment
2003 I. A. Bogatyreva
Deposit modeling using ROXAR's IRAP RMS software package
2003 S. V. Lyadov
Improving the quality of wellbore cementing by applying the technology of vibrating the entire length of the production string during the initial period of waiting for cement curing
2003 L. I. Garipova, R. A. Usmanov