Submit an Article
Become a reviewer
Vol 155 Iss. 2
Pages:
48-50
Download volume:
RUS
Article
Geology

Control of drilling parameters with the AMT-121 station

Authors:
E. V. Suetina
About authors
  • G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2002-07-10
Date accepted:
2002-08-04
Date published:
2003-12-30

Abstract

The AMT-121 station of ZAO Automated Monitoring Technologies is designed for operational geological and technological control of drilling vertical, directional and horizontal oil and gas wells. It provides drilling crews, technological and geological services of oil and gas production and drilling companies with complete and reliable information for optimal and trouble-free well drilling, optimal geological control of well drilling and well testing, management of field exploration and development. Monitors more than 90 measured and calculated geological, technological and technical-economic drilling parameters. Provides mechanical, filtration and gas logs. Performs lithologic column plotting, reservoir isolation with formation and pore pressure calculations, and prediction and delineation of zones of abnormally high formation pressure. Processes inclinometric measurements, builds well projections and makes wells prognosis in the tolerance circle. Automatically identifies the occurrence of 20 types of complications and emergencies.

Область исследования:
Geology
Funding:

None

Go to volume 155

Similar articles

Study of the Guinean bauxite leaching process
2003 O. E. Morozova
Use of surfactants to improve the quality of rock crushing
2003 A. S. Zhilin
Deposit modeling using ROXAR's IRAP RMS software package
2003 S. V. Lyadov
Theoretical analysis of water supply means of high-pressure self-propelled hydromonitors
2003 V. Yu. Mizurev
Technologies for extending the service life of oil wells
2003 I. V. Dorovskikh
Representatives of the suborder ammonitina from stratotypic and reference sections of the Jurassic of England, France, and Germany
2003 D. V. Bezgodova