Submit an Article
Become a reviewer
Vol 157
Pages:
122-125
Download volume:
RUS
Article

Methodology for forming the control action of the complete drive of drilling rigs

Authors:
N. V. Nefedova
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-07-08
Date accepted:
2003-08-04
Date published:
2004-09-17

Abstract

Long-term work of a number of geological and exploration industry teams on improvement of exploration drilling machines showed the necessity of systematization of accumulated experience in the field of electrical equipment development, combining such components as electric drive, remote control system and system of acquisition and analysis of technological drilling parameters. Until now each of these components was considered as a separate element, solving separate tasks. Complex approach in creation of unified structure allowed to develop a model of control system considering a number of technological process parameters and a technique of forming control action of complete electric drive.

Go to volume 157

Similar articles

Bench tests of pneumatic perforators with a twin hammer
2004 V. A. Pivnev, Z. A. Sazhko, Yu. V. Sudenkov, D. A. Yungmeister, A. L. Kuripko
Specific features of hydrotransport systems operation in winter conditions
2004 A. K. Nikolaev
Problems of improving the efficiency of power supply to mining and oil and gas enterprises
2004 B. N. Abramovich
Improvement of the shear unit for sterile sampling of ice core
2004 N. E. Bobin, M. Yu. Mirokhin
Application of HF energy in gold-bearing sands beneficiation technology
2004 O. B. Shonin
Laboratory bench based on flame and gas detection sensors
2004 M. A. Semenov, I. A. Pavlov, N. P. Kulikov