Submit an Article
Become a reviewer
Vol 157
Pages:
122-125
Download volume:
RUS
Article

Methodology for forming the control action of the complete drive of drilling rigs

Authors:
N. V. Nefedova
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-07-08
Date accepted:
2003-08-04
Date published:
2004-09-17

Abstract

Long-term work of a number of geological and exploration industry teams on improvement of exploration drilling machines showed the necessity of systematization of accumulated experience in the field of electrical equipment development, combining such components as electric drive, remote control system and system of acquisition and analysis of technological drilling parameters. Until now each of these components was considered as a separate element, solving separate tasks. Complex approach in creation of unified structure allowed to develop a model of control system considering a number of technological process parameters and a technique of forming control action of complete electric drive.

Funding:

None

Go to volume 157

Similar articles

Specifics of designing equipment for drilling wells in glaciers
2004 N. I. Vasilev, P. G. Talalai, L. M. Savatyugin
Optimization of the parameters of drum mills
2004 V. V. Shutov
Technological and dynamic studies of new designs of vibrating crushers
2004 S. V. Kazakov, R. M. Babaev, M. Yu. Tyagushev
Specific features of hydrotransport systems operation in winter conditions
2004 A. K. Nikolaev
Numerical modeling of problems of design and operation of transport machines in mining works
2004 S. V. Doronin, Yu. A. Plyutov
Research and analysis of roll hardening
2004 Yu. P. Boitsova, G. V. Ivanova