Submit an Article
Become a reviewer
Vol 159 No 1
Pages:
89-91
Download volume:

Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes

Authors:
M. R. Saitgareev
About authors
  • Student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-06
Date accepted:
2003-07-09
Date published:
2004-01-01

Abstract

The article considers the technology of advance protective screen construction using microtunnel boring complex for shallow tunnel construction. A concrete example of the tunnel construction in Perm using the equipment of the German company Herrenknecht AG is given.

Go to volume 159

Similar articles

Overview of foreign forecasts for the development of Russia's oil and gas potential
2004 P. A. Khantaev
Some results of coal industry restructuring and prospects for the development of the oil shale industry
2004 E. A. Soloveva, M. V. Manylova
Mathematical modeling of acrylic-based flushing fluids parameters
2004 D. A. Dernov, M. V. Lukiyanov
Improvement of nepheline speck leaching technology based on the use of combined coagulants-flocculants of the carboaluminate-alklar type
2004 S. A. Vinogradov
Compensation of higher harmonics in distribution networks with active filters
2004 O. B. Shonin, P. A. Rogov
Determination of optimal parameters of the limiting state zones of coal in the development of flat coal seams
2004 A. P. Gospodarikov, S. V. Vasilev, L. A. Bespalov