Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
89-91
Download volume:
RUS
Article

Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes

Authors:
M. R. Saitgareev
About authors
  • Student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-06
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The article considers the technology of advance protective screen construction using microtunnel boring complex for shallow tunnel construction. A concrete example of the tunnel construction in Perm using the equipment of the German company Herrenknecht AG is given.

Область исследования:
(Archived) Development of underground space
Funding:

None

Go to volume 159

Similar articles

Physical and chemical features of briquetted copper-nickel concentrate processing
2004 E. V. Ivanovskaya
Peculiarities of bauxite reserves calculation at one of the Vezha-Vorykvinsky deposit sites
2004 A. V. Kostyakhina
Environmental security of the region: the concept and content
2004 D. N. Smirnova
Economic efficiency of company diversification
2004 A. M. Ivanov
Some myths of contemporary Russian economic consciousness
2004 B. Ya. Pukshanskii, I. K. Zheltikova
Determination of optimal parameters of the limiting state zones of coal in the development of flat coal seams
2004 A. P. Gospodarikov, S. V. Vasilev, L. A. Bespalov