Submit an Article
Become a reviewer
Vol 159 No 1
Pages:
89-91
Download volume:
RUS

Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes

Authors:
M. R. Saitgareev
About authors
  • Student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-06
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The article considers the technology of advance protective screen construction using microtunnel boring complex for shallow tunnel construction. A concrete example of the tunnel construction in Perm using the equipment of the German company Herrenknecht AG is given.

Go to volume 159

Similar articles

Selection of a site for land use with the help of geographic information systems
2004 T. G. Safaralieva
Improvement of personal protective equipment for miners in the North
2004 S. P. Poltorykhin
Modeling of apparatuses for carbonization of aluminate solutions
2004 V. I. Davydov
Application of electrical technologies for thermal methods of heavy oil production
2004 S. N. Bataev
Compensation of higher harmonics in distribution networks with active filters
2004 O. B. Shonin, P. A. Rogov
Experimental and theoretical studies of transfer coefficients and heat transfer in the problems of filtration heat transfer
2004 N. N. Smirnova, Fam Tkhi Leu