Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
70-72
Download volume:
RUS
Article

Justification of investments in quarry construction to replenish the raw material base of OAO Karelsky Okatysh

Authors:
A. S. Semenov
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-26
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The technical and economic assessment of the development of open pits to replenish the raw material base of Karelsky Okatysh OJSC is presented. The calculation of economic risk and assessment of the feasibility of deposit development are carried out.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Influence of pulp temperature on zinc flotation performance
2004 A. M. Arustamyan
Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed
2004 I. A. Ishkulova
Peculiarities of bauxite reserves calculation at one of the Vezha-Vorykvinsky deposit sites
2004 A. V. Kostyakhina
Simulation of steady state operation of the air duct section
2004 P. S. Zavertkin
Assessing the influence of the converter load on current and voltage curve distortions
2004 Yu. A. Sychev
Prevention of coal spontaneous ignition during mining of thick steep seams in Kuzbass
2004 E. V. Glushenkov, A. A. Sidorenko