Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
70-72
Download volume:
RUS
Article

Justification of investments in quarry construction to replenish the raw material base of OAO Karelsky Okatysh

Authors:
A. S. Semenov
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-26
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The technical and economic assessment of the development of open pits to replenish the raw material base of Karelsky Okatysh OJSC is presented. The calculation of economic risk and assessment of the feasibility of deposit development are carried out.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Using fractal analysis to characterize the structure of the Alexandrinskoye ore deposit (Southern Urals)
2004 D. A. Petrov
Photo-planimetric survey of mine workings
2004 N. M. Voluevich
Economic assessment of the process of storing rock - pit waste during the formation of technogenic deposits
2004 E. B. Gridina
Engineering-geoecological analysis of the conditions of construction and operation of the Beregovaya compressor station (Blue Stream gas pipeline, Gelendzhik region)
2004 P. V. Kotyukov
Assessment of the prospects for the use of domestic mining equipment at the Kirov mine of OAO Apatit
2004 A. V. Skvortsov
On the problems of professional-applied training of mining students
2004 G. V. Rudenko, S. N. Mirnonenko