Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
70-72
Download volume:
RUS
Article

Justification of investments in quarry construction to replenish the raw material base of OAO Karelsky Okatysh

Authors:
A. S. Semenov
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-26
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The technical and economic assessment of the development of open pits to replenish the raw material base of Karelsky Okatysh OJSC is presented. The calculation of economic risk and assessment of the feasibility of deposit development are carried out.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Improvement of personal protective equipment for miners in the North
2004 S. P. Poltorykhin
On the problems of professional-applied training of mining students
2004 G. V. Rudenko, S. N. Mirnonenko
Improvement of nepheline speck leaching technology based on the use of combined coagulants-flocculants of the carboaluminate-alklar type
2004 S. A. Vinogradov
Selection of optimal PI controller parameters
2004 M. K. Anikin
Effect of the electrolyte cryolite ratio on the performance of high-power aluminum electrolysers
2004 D. A. Kaluzhskii
Assessment of the prospects for the use of domestic mining equipment at the Kirov mine of OAO Apatit
2004 A. V. Skvortsov