Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes

Authors:
M. R. Saitgareev
About authors
  • Student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-06
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The article considers the technology of advance protective screen construction using microtunnel boring complex for shallow tunnel construction. A concrete example of the tunnel construction in Perm using the equipment of the German company Herrenknecht AG is given.

Область исследования:
(Archived) Development of underground space
Funding:

None

Go to volume 159

Similar articles

Key outcomes of China's economic system reform
2004 Vei Bin
Experimental and theoretical studies of transfer coefficients and heat transfer in the problems of filtration heat transfer
2004 N. N. Smirnova, Fam Tkhi Leu
Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed
2004 I. A. Ishkulova
Technogenic eutrophication of hydro-ecosystems: quantitative bio-indication, risk analysis and prediction of consequences
2004 T. V. Maksimova, V. F. Shuiskii
Distribution of risk management costs according to the impact method criterion
2004 A. V. Smetankin
Overview of foreign forecasts for the development of Russia's oil and gas potential
2004 P. A. Khantaev