Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes

Authors:
M. R. Saitgareev
About authors
  • Student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-06
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The article considers the technology of advance protective screen construction using microtunnel boring complex for shallow tunnel construction. A concrete example of the tunnel construction in Perm using the equipment of the German company Herrenknecht AG is given.

Область исследования:
(Archived) Development of underground space
Funding:

None

Go to volume 159

Similar articles

Economic efficiency of company diversification
2004 A. M. Ivanov
Assessment of the prospects for the use of domestic mining equipment at the Kirov mine of OAO Apatit
2004 A. V. Skvortsov
Results of quantitative analysis of the synergy of environmental factors in their combined effects
2004 E. G. Nesterenko, O. S. Ivanova
Organization of the monitoring system of the Peter and Paul Cathedral on the basis of engineering-geological and geo-environmental analysis of the conditions of its functioning
2004 A. V. Shidlovskaya
Application of electrical technologies for thermal methods of heavy oil production
2004 S. N. Bataev
Prevention of coal spontaneous ignition during mining of thick steep seams in Kuzbass
2004 E. V. Glushenkov, A. A. Sidorenko