Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed
Authors:
About authors
- Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Abstract
Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.
Область исследования:
(Archived) Development of mineral deposits
Funding:
None
Similar articles
Engineering-geoecological analysis of the conditions of construction and operation of the Beregovaya compressor station (Blue Stream gas pipeline, Gelendzhik region)
2004 P. V. Kotyukov
Improvement of nepheline speck leaching technology based on the use of combined coagulants-flocculants of the carboaluminate-alklar type
2004 S. A. Vinogradov
Protection against wind erosion and improvement of bioproductivity of bulk dumps and reclaimed areas
2004 S. A. Ilchenkova, N. A. Gaspariyan