Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Economic assessment of the process of storing rock - pit waste during the formation of technogenic deposits
2004 E. B. Gridina
Heavy metal distribution trends in the Neva Bay of the Gulf of Finland
2004 Ya. G. Panteleeva
Modeling of apparatuses for carbonization of aluminate solutions
2004 V. I. Davydov
Wallrock metasomatites of the Pavlovskoye polymetallic deposit (Novaya Zemlya Archipelago)
2004 V. O. Ilchenko, A. V. Antonov
Protection against wind erosion and improvement of bioproductivity of bulk dumps and reclaimed areas
2004 S. A. Ilchenkova, N. A. Gaspariyan
Influence of pulp temperature on zinc flotation performance
2004 A. M. Arustamyan