Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Key outcomes of China's economic system reform
2004 Vei Bin
On the energy patterns of briquetting
2004 L. A. Lenev
Methods to reduce acidification of groundwater and surface water
2004 M. V. Parshina
Study of mixing processes in apparatuses with stirrers
2004 A. A. Markelov
Economic assessment of the process of storing rock - pit waste during the formation of technogenic deposits
2004 E. B. Gridina
Physical and chemical features of briquetted copper-nickel concentrate processing
2004 E. V. Ivanovskaya