Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Wallrock metasomatites of the Pavlovskoye polymetallic deposit (Novaya Zemlya Archipelago)
2004 V. O. Ilchenko, A. V. Antonov
Ways to improve the competitiveness of Russian coal companies
2004 O. Yu. Lebedeva
Improvement of personal protective equipment for miners in the North
2004 S. P. Poltorykhin
Ways to recycle and dispose of toxic industrial waste
2004 E. V. Eldina
Environmental security of the region: the concept and content
2004 D. N. Smirnova
Protection against wind erosion and improvement of bioproductivity of bulk dumps and reclaimed areas
2004 S. A. Ilchenkova, N. A. Gaspariyan