Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Retrospective analysis of cadastral valuation of land
2004 K. S. Shanina
Structure of the electromechanical part and synthesis of the stepper machine motion control algorithm for deep-sea research
2004 A. S. Ivanov
Mechanism of influence of spatial conditions of land use on the results of economic activity of enterprises
2004 E. N. Bykova
On the energy patterns of briquetting
2004 L. A. Lenev
Assessment of the prospects for the use of domestic mining equipment at the Kirov mine of OAO Apatit
2004 A. V. Skvortsov
Prevention of coal spontaneous ignition during mining of thick steep seams in Kuzbass
2004 E. V. Glushenkov, A. A. Sidorenko