Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Go to volume 159

Similar articles

Mechanism of influence of spatial conditions of land use on the results of economic activity of enterprises
2004 E. N. Bykova
Economic assessment of the process of storing rock - pit waste during the formation of technogenic deposits
2004 E. B. Gridina
Evaluating the efficiency of the working volume of mixing devices
2004 S. V. Aleksandrov
Photo-planimetric survey of mine workings
2004 N. M. Voluevich
Nanotribology: the effect of the relationship between the energy characteristics of the surface and the antifriction and insulating properties of adsorbed cationic surfactants
2004 A. G. Syrkov, S. E. Demyanov, I. V. Pleskunov, A. V. Fedorova
Assessment of the prospects for the use of domestic mining equipment at the Kirov mine of OAO Apatit
2004 A. V. Skvortsov