Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

On the energy patterns of briquetting
2004 L. A. Lenev
Photo-planimetric survey of mine workings
2004 N. M. Voluevich
Studying the spatial distribution patterns of ore mineralization of the Aganozero-Burakovskaya intrusion using quantitative interpretation in a three-dimensional environment
2004 I. V. Apukhtina
Wallrock metasomatites of the Pavlovskoye polymetallic deposit (Novaya Zemlya Archipelago)
2004 V. O. Ilchenko, A. V. Antonov
Environmental business and the prospects for its development in Russia
2004 V. V. Kosovtsev
On the greening of geology
2004 G. B. Pospekhov