Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Go to volume 159

Similar articles

Evaluating the efficiency of the working volume of mixing devices
2004 S. V. Aleksandrov
Methods to reduce acidification of groundwater and surface water
2004 M. V. Parshina
Assessment of the allowable contribution to the deterioration of electricity quality by industrial electrical consumers
2004 Yu. V. Gulkov
Application of electrical technologies for thermal methods of heavy oil production
2004 S. N. Bataev
Prevention of coal spontaneous ignition during mining of thick steep seams in Kuzbass
2004 E. V. Glushenkov, A. A. Sidorenko
On the problems of professional-applied training of mining students
2004 G. V. Rudenko, S. N. Mirnonenko