Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Evaluating the efficiency of the working volume of mixing devices
2004 S. V. Aleksandrov
Protection against wind erosion and improvement of bioproductivity of bulk dumps and reclaimed areas
2004 S. A. Ilchenkova, N. A. Gaspariyan
Experimental and theoretical studies of transfer coefficients and heat transfer in the problems of filtration heat transfer
2004 N. N. Smirnova, Fam Tkhi Leu
Key outcomes of China's economic system reform
2004 Vei Bin
Wallrock metasomatites of the Pavlovskoye polymetallic deposit (Novaya Zemlya Archipelago)
2004 V. O. Ilchenko, A. V. Antonov
Mathematical modeling of acrylic-based flushing fluids parameters
2004 D. A. Dernov, M. V. Lukiyanov