Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Improvement of personal protective equipment for miners in the North
2004 S. P. Poltorykhin
Regularities of stress and rock displacement distribution in the contour zone for layered massifs
2004 D. I. Raevskii
Organization of the monitoring system of the Peter and Paul Cathedral on the basis of engineering-geological and geo-environmental analysis of the conditions of its functioning
2004 A. V. Shidlovskaya
On the energy patterns of briquetting
2004 L. A. Lenev
Some myths of contemporary Russian economic consciousness
2004 B. Ya. Pukshanskii, I. K. Zheltikova
Justification of investments in quarry construction to replenish the raw material base of OAO Karelsky Okatysh
2004 A. S. Semenov