Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Justification of investments in quarry construction to replenish the raw material base of OAO Karelsky Okatysh
2004 A. S. Semenov
Nanotribology: the effect of the relationship between the energy characteristics of the surface and the antifriction and insulating properties of adsorbed cationic surfactants
2004 A. G. Syrkov, S. E. Demyanov, I. V. Pleskunov, A. V. Fedorova
Some results of coal industry restructuring and prospects for the development of the oil shale industry
2004 E. A. Soloveva, M. V. Manylova
Current state of nature management at iron ore enterprises in Russia and the main ways to improve it
2004 N. V. Gurova
Engineering-geoecological analysis of the conditions of construction and operation of the Beregovaya compressor station (Blue Stream gas pipeline, Gelendzhik region)
2004 P. V. Kotyukov
Economic efficiency of company diversification
2004 A. M. Ivanov