Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Mathematical modeling of acrylic-based flushing fluids parameters
2004 D. A. Dernov, M. V. Lukiyanov
Influence of pulp temperature on zinc flotation performance
2004 A. M. Arustamyan
Assessing the influence of the converter load on current and voltage curve distortions
2004 Yu. A. Sychev
Influence of the spacer plate position on the wear of the liner plates of jaw crushers with complex moving jaw
2004 N. S. Golikov
Prevention of coal spontaneous ignition during mining of thick steep seams in Kuzbass
2004 E. V. Glushenkov, A. A. Sidorenko
Improvement of deep borehole construction technology by drilling and blasting
2004 E. P. Reznikov