Prospects of utilization of the technogenic deposit of Dzhida tungsten-molybdenum complex
About authors
- 1 — Irkutsk State Technical University
- 2 — Irkutsk State Technical University
- 3 — Irkutsk State Technical University
Abstract
Prospects for expansion of the initial raw material base were considered. The scheme of processing of mineral raw materials of the main tailing dump of the Dzhida tungsten-molybdenum complex was developed and tested on the laboratory equipment.
Область исследования:
(Archived) Without section
Similar articles
Theoretical bases of thermal methods for utilization of hydro-mineral resources of Eastern Siberia
2005 E. Yu. Voronina, E. V. Zelinskaya
Use of technical standards at rationing of emissions of polluting substances into the atmosphere of production
2005 M. A. Smolin
Research of possibility of purification of nickel and cobalt solutions from lead and manganese by sorption methods
2005 M. A. Pleshkov, N. A. Sokolov, K. S. Novozhilova
Autoclave leaching of substandard ore sulfide concentrates of heavy non-ferrous metals
2005 Ya. M. Shneerson, M. I. Kalashnikova