Prospects of utilization of the technogenic deposit of Dzhida tungsten-molybdenum complex
About authors
- 1 — Irkutsk State Technical University
- 2 — Irkutsk State Technical University
- 3 — Irkutsk State Technical University
Abstract
Prospects for expansion of the initial raw material base were considered. The scheme of processing of mineral raw materials of the main tailing dump of the Dzhida tungsten-molybdenum complex was developed and tested on the laboratory equipment.
Similar articles
Results of mineralogical investigations of solid samples of initial and final products of atmospheric copper treatment in the technology of sulfuric acid leaching of high-copper feinstein
2005 A. V. Vydysh, M. N. Naftal, L. N. Ertseva, A. G. Morgacheskii
Improvement of copper concentrate roasting furnace design using physical modeling method
2005 P. S. Seregin, D. V. Rumyantsev, D. B. Maksimov
Modern Furnace Facilities for Roasting of Metallurgical Industrial Products
2005 V. E. Nikolskii, V. V. Kabluka, D. V. Vokhmintsev, V. O. Golubev
Assessment of the negative impact of acidic water on the components of the natural environment in the impact zone of OAO Severonickel
2005 M. A. Pashkevich, M. V. Parshina