Prospects of utilization of the technogenic deposit of Dzhida tungsten-molybdenum complex
About authors
- 1 — Irkutsk State Technical University
- 2 — Irkutsk State Technical University
- 3 — Irkutsk State Technical University
Abstract
Prospects for expansion of the initial raw material base were considered. The scheme of processing of mineral raw materials of the main tailing dump of the Dzhida tungsten-molybdenum complex was developed and tested on the laboratory equipment.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Determination of optimal electrolyte composition for electrolytic refining of copper
2005 O. I. Skrida, N. A. Ladin, G. N. Dylko
Development of modes of thickening of products of Nadezhda Metallurgical Plant using different flocculants
2005 R. D. Shestakova, A. F. Petrova, I. I. Asanova, I. G. Sushkova
Development of accelerated methods for determination of surfactant concentration for optimization of colloidal mode of copper electro-refining
2005 A. G. Torgashev, L. V. Volkov, E. M. Solovev