Prospects of utilization of the technogenic deposit of Dzhida tungsten-molybdenum complex
About authors
- 1 — Irkutsk State Technical University
- 2 — Irkutsk State Technical University
- 3 — Irkutsk State Technical University
Abstract
Prospects for expansion of the initial raw material base were considered. The scheme of processing of mineral raw materials of the main tailing dump of the Dzhida tungsten-molybdenum complex was developed and tested on the laboratory equipment.
Область исследования:
(Archived) Without section
Similar articles
Mathematical modeling of the effect of mining shocks on mine workings
2005 V. V. Karpenko, A. V. Karpenko
Goniometric attachment to diffractometer DRON-7 for texture and macro stress analysis
2005 V. N. Anisimov, V. A. Lifshits, A. V. Malkov, V. A. Pronichev, V. A. Firsova
Method of obtaining refined silver
2005 G. P. Kotukhova, N. N. Anisimova, R. D. Shestakova, A. K. Ter-Oganesyants, E. K. Khabirova