Improvement of technology of construction of the middle tunnel of the metro station "Zvenigorodskaya"

Authors:
E. P. Reznikov
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-02
Date accepted:
2005-07-01
Date published:
2006-03-30

Abstract

The article considers the technology of construction of the middle station tunnel, the technology of erecting the lining of the upper and lower vaults of the deep subway station of column type. Also attention is paid to the improvement of the technology of construction of the middle tunnel by changing the organization of works, which entails a reduction in the duration of construction of this structure.

Область исследования:
(Archived) Development of underground space
Funding:

None

Go to volume 167

Similar articles

Life and creativity of A.M. Zhuravsky
2006 V. V. Karpenko, K. V. Musova
Comparative analysis of methods for determining qualitative characteristics of facing stone of the Karelian Isthmus
2006 A. Ya. Tutakova
Sorption treatment of mine water from fluorine and boron at the Yakovlevskoye site
2006 A. G. Stukkei
Development of flushing technology when drilling horizontal wells by horizontal directional drilling units
2006 S. K. Pavlova
Control of energy quality parameters in networks with nonlinear load
2006 S. Yu. Tyagushev, V. V. Sobolev
Issues of management and economic activity of the forest park zone of St. Petersburg
2006 M. E. Skachkova