Submit an Article
Become a reviewer
Vol 167 Iss. 2
Pages:
35-37
Download volume:
RUS
Article
Geology

Improvement of technology of fastening of near-well zone with the purpose of liquidation of overflows in gas-condensate wells

Authors:
D. V. Mardashov
About authors
  • Samara State Technical University
Date submitted:
2005-07-23
Date accepted:
2005-08-13
Date published:
2006-04-07

Abstract

The problem of maintaining tightness of tubing annulus in gas and gas condensate reservoirs is especially urgent. Leakiness is caused by the fact that formation fluid in such reservoirs often contains aggressive components - hydrogen sulfide, carbon dioxide, as well as poor insulation of formations containing these agents. This leads to various complications during well operation.

Область исследования:
Geology
Funding:

None

Go to volume 167

Similar articles

Adaptation of geographical information system in net water-supply and sewage enterprises
2006 Ewa Wajs
Adaptative Holt’s forecasting model based on immune paradigm
2006 Tomasz Pelech
Technology of wastewater treatment and processing of solid waste containing chromium ions
2006 S. N. Alekseeva
Principal transformations in managerial control consequences privatisation energy system of distribution and supply electricity power of Romanian
2006 Mihaela Ghicajanu
Research of geometrical and strength parameters of water-insulating cofferdams for protection from water inflows from liquidated mines
2006 M. A. Ryazanov
Justification of parameters of extraction of sylvinite ores from pillars with application of auger excavation
2006 V. I. Shabun, Yu. G. Sirenko