Submit an Article
Become a reviewer
Vol 167 No 2
Pages:
35-37
Download volume:
Research article
Geology

Improvement of technology of fastening of near-well zone with the purpose of liquidation of overflows in gas-condensate wells

Authors:
D. V. Mardashov
About authors
  • Samara State Technical University
Date submitted:
2005-07-23
Date accepted:
2005-08-13
Date published:
2006-02-01

Abstract

The problem of maintaining tightness of tubing annulus in gas and gas condensate reservoirs is especially urgent. Leakiness is caused by the fact that formation fluid in such reservoirs often contains aggressive components - hydrogen sulfide, carbon dioxide, as well as poor insulation of formations containing these agents. This leads to various complications during well operation.

Go to volume 167

Similar articles

Adaptative Holt’s forecasting model based on immune paradigm
2006 Tomasz Pelech
Gold in jewelry art of masters of pre-Columbian America
2006 S. V. Komashchenko
Application of anti-turbulent additive in pumping diesel fuel through the main pipelines of OAO AK Transnefteprodukt
2006 I. P. Abramov, O. I. Dzardanov
Application of multifactor planning of experiment at research of flotability of calcium-containing minerals
2006 Yu. P. Batura, M. V. Uglovskaya
Justification of the layout scheme and parameters of the unit for the development of bottom fields of the Baltic Sea
2006 D. V. Smirnov
Modern mining enterprise as an integral technological system for coal mining and processing (on the example of OAO Polosukhinskaya Mine)
2006 K. V. Karzhavina, M. V. Karzhavina, P. Yu. Rabchenyuk