Abstract

The problem of maintaining tightness of tubing annulus in gas and gas condensate reservoirs is especially urgent. Leakiness is caused by the fact that formation fluid in such reservoirs often contains aggressive components - hydrogen sulfide, carbon dioxide, as well as poor insulation of formations containing these agents. This leads to various complications during well operation.

Go to volume 167

Similar articles

Modeling of logistic systems of coal supply of thermal power stations
2006 A. A. Rozhkov
Main directions of perfection of economic mechanism of reproduction of mineral raw material base at the present stage
2006 L. A. Nikolaichuk
Outsourcing and a value based management
2006 Dominik Kowal
Application of anti-turbulent additive in pumping diesel fuel through the main pipelines of OJSC AK Transnefteprodukt
2006 I. P. Abramov, O. I. Dzardanov
About local forecast of the zones dangerous by gas-dynamic phenomena on the south-eastern section of the mine field of the mine BKPRU-2 of OJSC Uralkali
2006 N. A. Salamatina
Copper extraction from diluted solutions using hollow fiber supported liquid membranes
2006 Mihaela Caltaru, Nicolae Petrescu, Cristina Vasiliu