Submit an Article
Become a reviewer
Vol 167 Iss. 2
Pages:
35-37
Download volume:
RUS
Article
Geology

Improvement of technology of fastening of near-well zone with the purpose of liquidation of overflows in gas-condensate wells

Authors:
D. V. Mardashov
About authors
  • Samara State Technical University
Date submitted:
2005-07-23
Date accepted:
2005-08-13
Date published:
2006-02-01

Abstract

The problem of maintaining tightness of tubing annulus in gas and gas condensate reservoirs is especially urgent. Leakiness is caused by the fact that formation fluid in such reservoirs often contains aggressive components - hydrogen sulfide, carbon dioxide, as well as poor insulation of formations containing these agents. This leads to various complications during well operation.

Область исследования:
Geology
Go to volume 167

Similar articles

Smart partnership for higher education: European Mineral Masters Engineering Course
2006 Judyta Hawrysz, Hans De Ruiter
Gas mixing in laboratory cores
2006 Jacek Blicharski
Strength analysis of the reason of initiation of fatigue defects in winding drums
2006 Dariusz Bańdo, Filip Matachowski
Peculiarities of the structure of ores of Rubtsovskoye sinter-polymetallic deposit (Ore Altai)
2006 D. A. Petrov
Efficiency of Investments in Human Capital as a Condition of High Profitability of Enterprise Personnel
2006 K. P. Sushkova
Assessment of Industrial Waste Storage Facility Impact on Groundwater
2006 Renata Rogowska-Kwas, Jan Macuda