Submit an Article
Become a reviewer
Vol 167 Iss. 2
Pages:
35-37
Download volume:
RUS
Article
Geology

Improvement of technology of fastening of near-well zone with the purpose of liquidation of overflows in gas-condensate wells

Authors:
D. V. Mardashov
About authors
  • Samara State Technical University
Date submitted:
2005-07-23
Date accepted:
2005-08-13
Date published:
2006-04-07

Abstract

The problem of maintaining tightness of tubing annulus in gas and gas condensate reservoirs is especially urgent. Leakiness is caused by the fact that formation fluid in such reservoirs often contains aggressive components - hydrogen sulfide, carbon dioxide, as well as poor insulation of formations containing these agents. This leads to various complications during well operation.

Область исследования:
Geology
Funding:

None

Go to volume 167

Similar articles

About local forecast of the zones dangerous by gas-dynamic phenomena on the south-eastern section of the mine field of the mine BKPRU-2 of OJSC Uralkali
2006 N. A. Salamatina
The agreement between the government of the republic of Poland and the government of the Russian Federation concerning the avoidance of double taxation with respect to income and property taxes
2006 Bartłomiej Mazurkiewicz
Ways of improvement of organizational-economic mechanism of management of enterprises of coal industry
2006 O. Yu. Lebedeva
Assessment of Industrial Waste Storage Facility Impact on Groundwater
2006 Renata Rogowska-Kwas, Jan Macuda
Study of physical and mechanical properties of rock mass of preparatory faces
2006 M. Yu. Dudko
Application of organic geochemistry methods to control the movement of WOCs and GOCs
2006 A. Yu. Popov