Submit an Article
Become a reviewer
Vol 167 Iss. 2
Pages:
35-37
Download volume:
RUS
Article
Geology

Improvement of technology of fastening of near-well zone with the purpose of liquidation of overflows in gas-condensate wells

Authors:
D. V. Mardashov
About authors
  • Samara State Technical University
Date submitted:
2005-07-23
Date accepted:
2005-08-13
Date published:
2006-02-01

Abstract

The problem of maintaining tightness of tubing annulus in gas and gas condensate reservoirs is especially urgent. Leakiness is caused by the fact that formation fluid in such reservoirs often contains aggressive components - hydrogen sulfide, carbon dioxide, as well as poor insulation of formations containing these agents. This leads to various complications during well operation.

Область исследования:
Geology
Go to volume 167

Similar articles

Aggregated estimation of investment projects of oil fields development
2006 A. S. Lebedev, A. N. Plotitsyn
Application of multifactor planning of experiment at research of flotability of calcium-containing minerals
2006 Yu. P. Batura, M. V. Uglovskaya
Design and operation of industrial robot used for painting of straight surfaces
2006 Zisopol Dragos Gabriel, Vasiloaie Alin, Sabalin Nicolae
Adaptation of geographical information system in net water-supply and sewage enterprises
2006 Ewa Wajs
Application of organic geochemistry methods to control the movement of WOCs and GOCs
2006 A. Yu. Popov
Comparative estimation of accounting approaches to substantiation of expediency of formation of reserves under depreciation of financial investments
2006 V. E. Soboleva