To calculation of parameters of drilling and anchoring installation

Authors:
V. I. Medvedkov1
S. S. Dranov2
V. P. Shebin3
About authors
  • 1 — Professor G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-07-01
Date accepted:
2006-09-19
Date published:
2007-03-02

Abstract

Drilling and boring units, which include a hydraulic motor and anchoring mechanism, are used to attach the cutting machine. The schemes of water supply of the machine tool are analyzed and a rational variant is selected. The disadvantages of the known water motors are disclosed and the ways of their improvement are suggested. Recommendations on calculation of the parameters of the hydraulic motor, on the design of the anchoring mechanism and its calculation are developed. The result on the efficiency of light cutting machine with a new way of fixing its time is obtained.

Область исследования:
(Archived) Mining electromechanics
Funding:

None

Go to volume 170

Similar articles

Engineering-geological and geo-ecological assessment of the stability of the rich iron ores of the Yakovlevsky mine (KMA)
2007 P. V. Kotyukov
Structure and mathematical model of asynchronous frequency electric drive without main coordinate sensors
2007 A. S. Ivanov
Kinetics of zinc leaching from slag of lead-copper production
2007 A. A. Chistyakov
Engineering and geological aspects of recultivation of territories disturbed by open mining operations
2007 G. B. Pospekhov
Philosophy of marketing in the 21st century
2007 B. Ya. Pukshanskiy, Zh. N. Khabipova
Peculiarities of mineral composition and geochemical characteristics of sulfide-platinometallic ore deposits of the Generalskaya Mountain (Kola Peninsula)
2007 N. S. Kropacheva