Submit an Article
Become a reviewer
Vol 170 Iss. 1
Pages:
61-64
Download volume:
RUS
Article

To calculation of parameters of drilling and anchoring installation

Authors:
V. I. Medvedkov1
S. S. Dranov2
V. P. Shebin3
About authors
  • 1 — Professor G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-07-01
Date accepted:
2006-09-19
Date published:
2007-03-02

Abstract

Drilling and boring units, which include a hydraulic motor and anchoring mechanism, are used to attach the cutting machine. The schemes of water supply of the machine tool are analyzed and a rational variant is selected. The disadvantages of the known water motors are disclosed and the ways of their improvement are suggested. Recommendations on calculation of the parameters of the hydraulic motor, on the design of the anchoring mechanism and its calculation are developed. The result on the efficiency of light cutting machine with a new way of fixing its time is obtained.

Область исследования:
(Archived) Mining electromechanics
Funding:

None

Go to volume 170

Similar articles

Technology of joint processing of nepheline and bauxite
2007 S. A. Vinogradov
Investigation of asynchronous generator of wind power plant
2007 A. V. Kudryavtsev
Resource-saving technologies of heat energy production on the basis of solid combustible carbon containing waste processing
2007 Yu. V. Shuvalov, A. N. Nikulin
Thermodynamic description of extraction of rare earth metals by carboxylic acids from nitrate media
2007 V. S. Strashinova
Investigation of ground water transformation in the zone of oil fields impact
2007 M. V. Kozhevnikova
Management of borrowed capital formation (on the example of JSC MNPO Polymetal)
2007 N. M. Ovchinnikova