Article

To calculation of parameters of drilling and anchoring installation

Authors:
V. I. Medvedkov1
S. S. Dranov2
V. P. Shebin3
About authors
  • 1 — Professor G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-07-01
Date accepted:
2006-09-19
Date published:
2007-03-02

Abstract

Drilling and boring units, which include a hydraulic motor and anchoring mechanism, are used to attach the cutting machine. The schemes of water supply of the machine tool are analyzed and a rational variant is selected. The disadvantages of the known water motors are disclosed and the ways of their improvement are suggested. Recommendations on calculation of the parameters of the hydraulic motor, on the design of the anchoring mechanism and its calculation are developed. The result on the efficiency of light cutting machine with a new way of fixing its time is obtained.

Область исследования:
(Archived) Mining electromechanics
Go to volume 170

Similar articles

History of lithogenesis of Lower Permian shikhans
2007 A. Z. Kagarmanova
Mechanism of artificial well curvature by continuous sliding deviators
2007 Yu. T. Morozov, A. M. Mochulovsky
Distribution of impurities in aluminum cathode depending on technological factors
2007 D. V. Makushin
Environmental Risk Management
2007 V. M. Vasiltsova, D. S. Olenin
Development of effective technological schemes of excavation of thick hollow coal seams prone to self-ignition
2007 S. A. Sidorenko, A. A. Sidorenko
Foreign experience in improvement of organizational and economic mechanism of reproduction of mineral raw material base of Russia
2007 N. V. Pashkevich, L. A. Nikolaichuk