Submit an Article
Become a reviewer
Vol 172
Pages:
201-204
Download volume:
Research article
Geoecology

Monitoring of technogenic impact of environmentally hazardous facilities of OJSC Gazprom

Authors:
M. A. Pashkevich1
I. B. Movchan2
T. A. Petrova3
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-10-01
Date accepted:
2006-12-04
Date published:
2007-04-01

Abstract

A system of industrial environmental monitoring (IEM) for the «Gazprom Company» is offered. The ARCGis information and measuring system is offered to be used as the IEM programming support which helps to carry out real time acquisition of data on the condition of the bodies monitored, data processing and analysis as well as distribution of monitoring result among various subdivisions of the enterprise. It was established that one of the most rational approaches to create the IEM system is introduction of the interpretation module of satellite images, taken in various spectral ranges and characterized with high spatial resolution characteristics.

Go to volume 172

References

  1. Абросимов А.А. Исследование, разработка и внедрение методов повышения уровня экологической безопасности нефтеперерабатывающего производства: Автореф. дис. ... д-ра техн. наук / ГАНГ им. И.М.Губкина. М., 1998.
  2. Абросимов А.А. Экологический мониторинг окружающей среды НПЗ / А.А.Абросимов, Ю.Ю.Ерохин // Нефтепереработка и нефтехимия / ЦНИИТЭнефтехим. М., 1997. С.44-45.
  3. Пашкевич М.А. Оценка экологической опасности линейных объектов ТЭК / М.А.Пашкевич, Т.А.Петрова // Горный информационно-аналитический бюллетень. № 11 / МГГУ. М., 2005. с.158-165.

Similar articles

To the issue of selection of the boundary criterion for rock shear muldes in the rock mass above the tunnel under construction
2007 E. M. Volokhov, V. N. Gusev, Yu. V. Lir
Mine observations on the condition of the fastenings of the horizontal excavations interfaces in weak ores
2007 D. N. Petrov
Causes of formation of temporarily inoperable quarry sides and methods of their preservation by means of creation of bulk prism
2007 G. A. Kholodnyakov, D. V. Teterin
Investigation of the formation of stress-strain state of rock massif around two parallel tunnels
2007 R. I. Larionov
Problems of prediction of loads on linings and stability of operated tunnels
2007 A. G. Protosenya, M. A. Karasev, E. G. Kozin
Sonic location method of mine shaft sinking control by drilling
2007 V. K. Chumak, A. I. Naumenko