Justification of rational methods of opening and mining of IV horizon in conditions of Starobinskoe potassium salt deposit
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
Methodical approaches for substantiation of rational development and mining of new potash horizon are presented in the article. The state of ore mines of «Belaruskali», geological conditions of the IV potash horizon, main aspects concerning geomechanical substantiation of development parameters are reviewed. Recommendations on development of IV potash horizon at the Third mine («Belaruskali») are given on the basis of analysis of stress and strain state of the rock strata.
Область исследования:
(Archived) Geotechnology
Funding:
None
Similar articles
Geotechnological and environmental aspects of construction and operation of ductless heat pipelines in St. Petersburg
2007 L. K. Gorshkov, P. K. Tulin, N. G. Kikichev
Features of the assessment of the impact of mining and industrial enterprises on water ecosystems
2007 D. S. Petrov, M. Yu. Ionova
Increase of efficiency and safety of mining works at coal stripping by large splinter
2007 S. A. Tolstunov, S. P. Mozer
Regularities of stress distribution in the protective cover during mining of the massif of rich iron ores of KMA with laying of the excavated space
2007 D. A. Potemkin