Submit an Article
Become a reviewer
Vol 173
Pages:
139-140
Download volume:
RUS
Article

Mathematical modeling of open cycle of grinding in rod mill

Authors:
N. V. Nikolaeva
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-11-05
Date accepted:
2007-01-16
Date published:
2007-12-29

Abstract

Modeling of ore treatment processes allows selecting those options that contribute to cost and risk reduction. The use of universal forecasting software packages, such as JKSimMet, greatly facilitates and accelerates the calculation processes associated with the analysis of ore treatment schemes, saves not only time, but also money, giving the opportunity to consider many options with the subsequent selection of the most effective. In some cases, computer modeling is the only way to obtain reliable results.

Область исследования:
Metallurgy
Funding:

None

Go to volume 173

Similar articles

Improvement of organizational-economic mechanism of reproduction of mineral raw material base of oil industry
2007 N. V. Pashkevich, L. A. Nikolaychuk
Economic evaluation of hydrocarbon fields of Sakhalin Island shelf
2007 D. M. Metkin
Development of structure and algorithm of control of escalator drive with basic coordinates observer
2007 A. S. Ivanov
Application of international classification of ecological costs on the example of OJSC Karelsky Okatysh
2007 E. I. Gapeeva
Slaughtering electro-thermogenerator for combined thermal influence on productive formations of high-viscosity oil
2007 D. N. Markushev
Analysis of modern state of fuel and energy complex of Russia
2007 Ya. V. Voronina, L. I. Iseeva