Submit an Article
Become a reviewer
Vol 173
Pages:
57-59
Download volume:
RUS
Article

Risk assessment of decisions at designing of open pits

Authors:
S. I. Fomin1
A. S. Semenov2
About authors
  • 1 — Associate professor G.V. Plekhanov Saint Petersburg Mining University
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2006-11-28
Date accepted:
2007-01-29
Date published:
2007-12-29

Abstract

The problem of accuracy and reliability of design decisions is a characteristic feature of the present stage in development of all material production spheres, including the mining industry. A whole range of unresolved problems still exists in enhancing reliability of open-pits designing. A lot of research publications are investigating interrelations of the accuracy and uncertainty categories with reference to specific conditions in order to solve practical problems. Scientific research in decision-making techniques in conditions of uncertainty and risk, in development of heuristic approaches, methods of stochastic modelling and programming are of utmost interest in terms of open-pit designing.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 173

Similar articles

Formation of corporate companies in the Russian economy
2007 A. Yu. Nikolaeva
Analysis of energy losses in hydraulic stage
2007 N. A. Ekimov
Modeling of steady-state operation mode of air-pipe section
2007 M. A. Trotsko
Application of laser-scanning technologies at mine surveying at quarries
2007 E. A. Pravdina
Investigation of frequency converter of adjustable electric drive on the basis of four level voltage inverter
2007 A. V. Kudryavtsev
Development of technology of processing of low-quality coal with the purpose of extraction of non-ferrous metals from it
2007 G. S. Roshchin