Some topics on using ultrasonic method for concrete casting level measurement in bored pile foundation
About authors
- 1 — China University of Geosciences
- 2 — China University of Geosciences
- 3 — China University of Geosciences
Abstract
With the rapid growth of China's economy, bored piles are widely used in infrastructure construction projects. But how to get the exact surface of the poured concrete is a difficult problem in quality control of bored piles. In practice, the only way to avoid quality problems is to pour a larger volume of concrete, which results in more waste and creates more burden on the environment due to the discarded concrete columns. Therefore, the development of an ultrasonic device to measure the concrete pouring level is highly relevant. Based on the analysis of the negative consequences of pouring too much concrete, the paper presents the design scheme of the device, summarizes the main difficulties and summarizes the results of our group.
Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Funding:
None
Similar articles
Large scale investments in Russia’s infrastructure and natural resources sector
2008 Thomas Schumann
Energy saving compensated asynchronous motors and electric drives on their basis
2008 A. R. Mugalimova
Development and application of 3D-model of the territory for making optimal management decisions
2008 I. V. Ilinykh
Stimulation of investment attractiveness of environmental impact by methods of tax regulation
2008 T. A. Shelyakina