Submit an Article
Become a reviewer
Vol 174
Pages:
93-97
Download volume:
RUS
Article

Analytical method of determining the overburden exploitation factor by means of the graph of its minimum current volumes

Authors:
M. P. Bukasa
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-07-11
Date accepted:
2007-09-20
Date published:
2008-03-17

Abstract

The work is devoted to the analytical method of solving the problem of stabilization of quarry productivity. The dependence of the average operating stripping ratio on the duration of the operational period of the open pit activity is established. Practical calculations are presented for one of the diamond kimberlite pipes of the Democratic Republic of Congo and were performed on the basis of AutoCAD 2006 and Microsoft Excel.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 174

Similar articles

Technology of fabrication in relation to microstructure of Ni-Ti shape memory alloys
2008 I. Szurman, M. Kursa
Monitoring and development of methods of oil sludge pits reclamation
2008 M. M. Malyshkin, M. A. Pashkevich
PB- and SR-isotopes – indicators for mixing processes in mine waters of the «Himmelfahrt Fundgrube»
2008 Heidel Claudia
Investigation of development system variants with ore and host rock collapse by computer modeling
2008 A. M. Gildeev
Experimental researches for the reduction of the noxes during the burning of pit coal from Jiu Valley – Romania
2008 Ciolea Daniela Ionela
Features of engineering-geological surveys in areas of eluvial soil development (on the example of Nizhnekamsk)
2008 I. I. Nugmanov