Engineering-geological conditions of construction of the new Polunochnoe-Obskaya railroad line

Authors:
V. S. Frolov1
Ya. N. Volzhonok2
V. I. Voitsekhovskaya3
About authors
  • 1 — JSC Lengiprotrans
  • 2 — JSC Lengiprotrans
  • 3 — JSC Lengiprotrans
Date submitted:
2007-09-03
Date accepted:
2007-11-23
Date published:
2008-10-06

Abstract

The government of Russian Federation is considering the matter of building a new railway line because it is necessary to develop resources of Ural and the northern part of Tumensky regions. The length of this new railway and passing through several climatic zones cause a great variety of complicated engineering- geological conditions and a wide range of dangerous geological processes.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Funding:

None

Go to volume 176

Similar articles

Witwatersrand and the problem of ore formation
2008 N. A. Shilo
Use of isotope data (δ2H, δ18O, 234U/238U) in the study of permafrost degradation processes as a result of long-term climate variations
2008 I. V. Tokarev
Spectrophotometric analysis of fine-grained fraction of red-colored strata
2008 A. G. Bogatyreva
Geochemistry of submarine ore-forming hydrotherms of the North Atlantic according to the data of remote observations and sampling from underwater manned vehicles
2008 S. M. Andreeva, M. V. Krivitskaya, D. V. Kaminskiy
Results of electrical exploration in search of pipe-type objects in the areas of Arkhangelsk region
2008 Yu. V. Korotkov
About application of a complex of direct methods of search for coal-hydrocarbons in the process of oil and gas prospecting works of NAK Neftegas of Ukraine
2008 A. N. Koval, P. M. Chepil