Engineering-geological conditions of construction of the new Polunochnoe-Obskaya railroad line
About authors
- 1 — JSC Lengiprotrans
- 2 — JSC Lengiprotrans
- 3 — JSC Lengiprotrans
Abstract
The government of Russian Federation is considering the matter of building a new railway line because it is necessary to develop resources of Ural and the northern part of Tumensky regions. The length of this new railway and passing through several climatic zones cause a great variety of complicated engineering- geological conditions and a wide range of dangerous geological processes.
Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Funding:
None
Similar articles
Engineering-geological peculiarities of design and construction of underground sewage collectors in St. Petersburg by microtunneling method
2008 V. V. Artemyev, A. T. Artemyev, I. V. Artemyev, L. P. Artemyev
Application of 2DMTZ for oil prospecting in the delta of the St. Clee River (south-eastern Ontario, Canada)
2008 A. I. Ingerov
Use of isotope data (δ2H, δ18O, 234U/238U) in the study of permafrost degradation processes as a result of long-term climate variations
2008 I. V. Tokarev