Submit an Article
Become a reviewer
Vol 176
Pages:
230-234
Download volume:
RUS
Article

Engineering-geological conditions of construction of the new Polunochnoe-Obskaya railroad line

Authors:
V. S. Frolov1
Ya. N. Volzhonok2
V. I. Voitsekhovskaya3
About authors
  • 1 — JSC Lengiprotrans
  • 2 — JSC Lengiprotrans
  • 3 — JSC Lengiprotrans
Date submitted:
2007-09-03
Date accepted:
2007-11-23
Date published:
2008-10-06

Abstract

The government of Russian Federation is considering the matter of building a new railway line because it is necessary to develop resources of Ural and the northern part of Tumensky regions. The length of this new railway and passing through several climatic zones cause a great variety of complicated engineering- geological conditions and a wide range of dangerous geological processes.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Funding:

None

Go to volume 176

Similar articles

Influence of buried bogs on the formation of engineering-geological and geo-ecological conditions in the underground space of St. Petersburg
2008 E. G. Zakharova
Problems of development of underground space of St. Petersburg and geological processes
2008 O. Yu. Aleksandrova
Spectrophotometric analysis of fine-grained fraction of red-colored strata
2008 A. G. Bogatyreva
Carbonate sequences of the Middle Ordovician-Silurian of the Pechora-Barents Sea megabasin
2008 N. V. Taninskaya
Optical methods in environmental monitoring of ocean
2008 I. V. Portnoy, V. K. Portnoy
Engineering-geological support of vertical shaft sinking
2008 S. V. Sergeev