Submit an Article
Become a reviewer
Vol 176
Pages:
230-234
Download volume:
RUS
Article

Engineering-geological conditions of construction of the new Polunochnoe-Obskaya railroad line

Authors:
V. S. Frolov1
Ya. N. Volzhonok2
V. I. Voitsekhovskaya3
About authors
  • 1 — JSC Lengiprotrans
  • 2 — JSC Lengiprotrans
  • 3 — JSC Lengiprotrans
Date submitted:
2007-09-03
Date accepted:
2007-11-23
Date published:
2008-10-06

Abstract

The government of Russian Federation is considering the matter of building a new railway line because it is necessary to develop resources of Ural and the northern part of Tumensky regions. The length of this new railway and passing through several climatic zones cause a great variety of complicated engineering- geological conditions and a wide range of dangerous geological processes.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Go to volume 176

Similar articles

Numerical modeling of pollutants migration in marsh sediments
2008 I. L. Kharkhordin
Results of electrical exploration in search of pipe-type objects in the areas of Arkhangelsk region
2008 Yu. V. Korotkov
Witwatersrand and the problem of ore formation
2008 N. A. Shilo
Quantitative analysis of hydrogeochemical laws on the basis of multidimensional classification G-method
2008 A. I. Gavrishin, A. Koradini
Influence of buried bogs on the formation of engineering-geological and geo-ecological conditions in the underground space of St. Petersburg
2008 E. G. Zakharova
About some conversion works of Central Research Institute Gidropribor, connected with environmentalism, oil search, lifting of products from the sea bottom
2008 L. M. Wolfson