Submit an Article
Become a reviewer
Vol 176
Pages:
221-225
Download volume:
RUS
Article

Selection and substantiation of optimal order and time of drilling of water-reducing wells of drainage contour in the course of open mining of the M.V.Lomonosov deposit

Authors:
F. G. Atroshchenko1
D. A. Drugov2
R. A. Filin3
About authors
  • 1 — St. Petersburg Branch of the Institute of Geoecology, RAS
  • 2 — St. Petersburg Branch of the Institute of Geoecology, RAS
  • 3 — St. Petersburg Branch of the Institute of Geoecology, RAS
Date submitted:
2007-09-19
Date accepted:
2007-11-24
Date published:
2008-10-06

Abstract

The deposit of Lomonosov developed at a trial level, now is at a stage of transition to its fullscale development by the open way. At the same time, first of all, a single open pit is expected to fulfill the diamond pipes of the southern group – Arkhangelskaya and Karpinsky 1 and 2. In this connection the development directed on a substantiation of systems of drainage «big career» and water removals of drainage and other waters were required also. Authors, on the basis of the analysis and generalization of available data, have tried to find the optimal engineering decisions allowing essentially to raise ecological safety of work of given systems at rather low technical and economic expenses.

Область исследования:
(Archived) Problems of hydrogeological and engineering-geological conditions assessment in the development of territories
Go to volume 176

Similar articles

Quantitative analysis of hydrogeochemical laws on the basis of multidimensional classification G-method
2008 A. I. Gavrishin, A. Koradini
Hydrogeomechanical processes at flooding of coal mines
2008 Yu. A. Norvatov
Experimental study of internal waves in the Arctic shelf zone
2008 O. D. Shishkina
About some conversion works of Central Research Institute Gidropribor, connected with environmentalism, oil search, lifting of products from the sea bottom
2008 L. M. Wolfson
The first domestic rules for construction and guidelines for operation of offshore submarine pipelines
2008 N. A. Reshetov, V. K. Shurpyak, V. G. Makarov, O. Ya. Timofeev, N. I. Zinchenko
Engineering-geological peculiarities of design and construction of underground sewage collectors in St. Petersburg by microtunneling method
2008 V. V. Artemyev, A. T. Artemyev, I. V. Artemyev, L. P. Artemyev