Article

Risk assessment during towing of marine objects

Authors:
A. B. Ivanov1
S. A. Ivanov2
About authors
  • 1 — Onega Research and Production Association
  • 2 — Onega Research and Production Association
Date submitted:
2007-09-03
Date accepted:
2007-11-19
Date published:
2008-10-06

Abstract

In the procedure of the risk appraisal for a project of offshore towing of the large-size object, an algorithm of the «risk-management» is proposed to estimate the whole scope of assuming hazardous events. The initial – qualitative phase of analysis determines a possible range of risk factors, provides their description and classification. The second – quantitative phase evaluates their probability and subsequent cost values. The third stage of the risk values analysis – phase of the control – provides the cyclic recurrence of the risk-management. In sum, estimation of probable kinds of risks, while the towing, leads to ensured choice of compensating measures and, as a result, provides the needed level of security during the towing of, for instance, the jack-up rig platform.

Область исследования:
(Archived) Problems of shelf development: geology and ocean engineering
Go to volume 176

Similar articles

Numerical modeling of pollutants migration in marsh sediments
2008 I. L. Kharkhordin
Economic-mathematical model of arrangement and industrial exploitation of offshore oil and gas fields
2008 Yu. D. Dekhtyaruk, A. B. Kartashev
Analysis of causes of deformations of Kazan Cathedral and organization of object monitoring
2008 A. V. Shidlovskaya
Engineering-geological conditions of construction of the new Polunochnoe-Obskaya railroad line
2008 V. S. Frolov, Ya. N. Volzhonok, V. I. Voitsekhovskaya
Hydrogeomechanical processes at flooding of coal mines
2008 Yu. A. Norvatov
Experimental study of internal waves in the Arctic shelf zone
2008 O. D. Shishkina