Model of calculation of material balance of firing process on clinker for Portland cement production in rotary kiln

Authors:
Yu. V. Sharikov1
P. V. Ivanov2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-10-27
Date accepted:
2007-12-26
Date published:
2008-10-23

Abstract

The essence of process of roasting charge on clinker was considered. The model of a rotating furnace was constructed in software package ReactOp. Dependences of the basic components processed charge on length of the furnace of sintering and the general change of the basic mass streams were found.

Go to volume 177

References

  1. Колокольников В.С. Производство цемента. М.: Высшая школа, 1967.
  2. Еремин Н.И. Процессы и аппараты глиноземного производства / Н.И. Еремин, А.Н.Наумчик, В.Г.Казаков. М.: Металлургия, 1980.

Similar articles

Principles of construction and experience of implementation of modern systems of energy resources accounting and dispatch control of energy objects at the enterprises of mining and ore mining industry
2008 S. V. Andreev, S. V. Serzhantov
System of automatic control of the Ore treatment section of diamond mining factory
2008 R. D. Pavlov, Yu. V. Sharikov
About optimum control of mine drainage systems operation
2008 O. V. Kabanov
Equation of flotation process kinetics
2008 I. N. Beloglazov
Mathematical modeling of the process of ultra-deep desiliconization of aluminate solutions with preliminary introduction of hydrogranate sludge
2008 V. M. Sizyakov, E. V. Sizyakova
Methods and approaches to electrolyzer control depending on working conditions and design
2008 M. A. Glushchenko