Abstract

The essence of process of roasting charge on clinker was considered. The model of a rotating furnace was constructed in software package ReactOp. Dependences of the basic components processed charge on length of the furnace of sintering and the general change of the basic mass streams were found.

Область исследования:
(Archived) Mathematical modeling of technological processes in metallurgy
Funding:

None

Go to volume 177

Similar articles

Mathematical description of the process of absorption of heat flow of radiation moving in a real medium
2008 I. N. Beloglazov, V. A. Ivanov, I. I. Beloglazov
Methods and approaches to electrolyzer control depending on working conditions and design
2008 M. A. Glushchenko
System of dispatching of the Karier mining-transport equipment. Integration and automatic optimization
2008 N. V. Odintsev
Calculation of thermal regime of rotary kiln
2008 V. O. Golubev, P. V. Ivanov
Foreign experience of automation in mining industry
2008 S. I. Popov, E. D. Kadyrov
Automated control system of ore preparation process at the enrichment plant
2008 N. V. Zyryanova