Model of calculation of material balance of firing process on clinker for Portland cement production in rotary kiln

Authors:
Yu. V. Sharikov1
P. V. Ivanov2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-10-27
Date accepted:
2007-12-26
Date published:
2008-10-23

Abstract

The essence of process of roasting charge on clinker was considered. The model of a rotating furnace was constructed in software package ReactOp. Dependences of the basic components processed charge on length of the furnace of sintering and the general change of the basic mass streams were found.

Go to volume 177

References

  1. Колокольников В.С. Производство цемента. М.: Высшая школа, 1967.
  2. Еремин Н.И. Процессы и аппараты глиноземного производства / Н.И. Еремин, А.Н.Наумчик, В.Г.Казаков. М.: Металлургия, 1980.

Similar articles

Modeling of subsystems of alumina concentration control in aluminum electrolyzer
2008 M. A. Glushchenko
Onboard control system of excavator
2008 G. A. Popov
Modeling of Vanyukov Process by full factorial experiment
2008 N. V. Danilova, E. D. Kadyrov
Methods and approaches to electrolyzer control depending on working conditions and design
2008 M. A. Glushchenko
Automated control system of mining-transport complex
2008 A. G. Polyakov
Modernization of automatic control system of speck dust leaching shop of Boksitogorsk clay-earth plant
2008 S. A. Galkin