Submit an Article
Become a reviewer
Vol 177
Pages:
161-163
Download volume:
RUS
Article

Model of calculation of material balance of firing process on clinker for Portland cement production in rotary kiln

Authors:
Yu. V. Sharikov1
P. V. Ivanov2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-10-27
Date accepted:
2007-12-26
Date published:
2008-10-23

Abstract

The essence of process of roasting charge on clinker was considered. The model of a rotating furnace was constructed in software package ReactOp. Dependences of the basic components processed charge on length of the furnace of sintering and the general change of the basic mass streams were found.

Область исследования:
(Archived) Mathematical modeling of technological processes in metallurgy
Funding:

None

Go to volume 177

Similar articles

Advantages of using weighing devices for wheel loaders
2008 Eero Hiltunen
Methodical maintenance of use of results of the automated monitoring of self-propelled equipment and dump trucks
2008 A. A. Kuleshov
Mathematical description of the process of absorption of heat flow of radiation moving in a real medium
2008 I. N. Beloglazov, V. A. Ivanov, I. I. Beloglazov
Onboard control system of excavator
2008 G. A. Popov
System of dispatching of the Karier mining-transport equipment. Integration and automatic optimization
2008 N. V. Odintsev
Calculation of thermal regime of rotary kiln
2008 V. O. Golubev, P. V. Ivanov