Submit an Article
Become a reviewer
Vol 177
Pages:
100-103
Download volume:
RUS
Article

About optimum control of mine drainage systems operation

Authors:
O. V. Kabanov
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-10-23
Date accepted:
2007-12-16
Date published:
2008-10-23

Abstract

The offered managerial system state of working mining installation for rollout of water providing minimum expenseses to electric powers. It is shown way of the shaping the algorithm of optimum control is. Given its mathematical description.

Область исследования:
(Archived) Automation of technological processes
Go to volume 177

Similar articles

System of automatic control of the Ore treatment section of diamond mining factory
2008 R. D. Pavlov, Yu. V. Sharikov
Compensation of disturbance effect on technological process
2008 E. D. Kadyrov
Software complex of generalized index of physical state of objects with distributed parameters
2008 R. M. Proskuryakov, N. Yu. Ulanova, A. V. Spesivtsev
Calculation of thermal regime of rotary kiln
2008 V. O. Golubev, P. V. Ivanov
Modern instrumentation of gas analysis
2008 I. A. Kamaldinov, I. N. Beloglazov, D. S. Kireev
Modernization of automatic control system of speck dust leaching shop of Boksitogorsk clay-earth plant
2008 S. A. Galkin