Development and research of the arrangement of the executive body of the tunneling complex for the mines of OJSC Metrostroy
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — G.V. Plekhanov Saint Petersburg Mining Institute
- 4 — OJSC Metrostroy
Abstract
In clause the variant of configuration of an agency to passed a complex for mines Metrostroja of Saint Petersburg is presented. Formulas and results of calculation of key parameters of an agency of a complex on the COMPUTER by Poderni R.J.'s technique for hydraulicimpact and modernized program KOR_N for hydraulic mills are resulted. Use of hydraulic mills of longitudinal rotation as an agency on working off of a face is proved. The cycle to passed works of a complex is stated.
Область исследования:
(Archived) Diagnostics and control of technical systems and their elements. New technologie
Funding:
None
Similar articles
Design and calculation methodology of double-circuit vertical belt conveyor for mining industry
2008 Yu. D. Tarasov
The area of existence of involute gear mesh with a given overlap coefficient
2008 A. S. Fokin, A. A. Poddubnaya, S. L. Ivanov, E. A. Kremcheev