Automatic sectionalization in electrical networks with voltage 6-10 kV
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
Problems of increase reliability electro-supply distributive networks of an average voltage at the mountain enterprises are considered. It is shown, that introduction decentralized with application of automatic points of sectioning considerably reduces systems consumption the electric power. Algorithms decentralized managements of emergency operation work of a network are resulted.
Область исследования:
(Archived) Electric drive, power supply, automation and control of mining and oil and gas production
Funding:
None
Similar articles
Long-range redundancy of protection failures in 0,4 kV networks at gas transportation enterprises
2008 A. V. Belenko, S. P. Petrov
Relevance of application of centralized protection with inverse dependent time-current characteristic of RXIDG type for networks with resistive neutral groundi
2008 M. A. Bychin