Submit an Article
Become a reviewer
Vol 178
Pages:
135-138
Download volume:
RUS
Article

Automatic sectionalization in electrical networks with voltage 6-10 kV

Authors:
Yu. L. Zhukovskiy1
E. Kh. Muratbakeev2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-11-02
Date accepted:
2008-01-28
Date published:
2008-11-18

Abstract

Problems of increase reliability electro-supply distributive networks of an average voltage at the mountain enterprises are considered. It is shown, that introduction decentralized with application of automatic points of sectioning considerably reduces systems consumption the electric power. Algorithms decentralized managements of emergency operation work of a network are resulted.

Область исследования:
(Archived) Electric drive, power supply, automation and control of mining and oil and gas production
Go to volume 178

Similar articles

Separation of drilled cylindrical billet from rock massif
2008 Yu. A. Eist, P. G. Talalay
Increase of reliability of machines and mechanisms operation in underground constructions of cryolithozone
2008 A. F. Galkin
Dielcometric meter of humidity of bulk media
2008 S. S. Galushkin
Reduction of influence of higher harmonics on work of electrical complex of mining enterprise
2008 Ya. E. Shklyarskiy, D. A. Sitnikov, A. N. Skam'in
Laboratory investigations of the pre-existing actuator of the aggregate of iron-manganese nodule collection
2008 D. A. Jungmeister, A. V. Bolshunov, D. V. Smirnov
Modern methods of controlling the work of powerful excavator-automobile complexes at quarries
2008 A. A. Kuleshov