Submit an Article
Become a reviewer
Vol 178
Pages:
110-115
Download volume:
RUS
Article

Complex system of quality control of electric energy at the enterprises on mining and processing of minerals

Authors:
B. N. Abramovich
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-11-02
Date accepted:
2008-01-04
Date published:
2008-11-18

Abstract

Power quality level (PQ) is an important factor for providing of continuity and efficiency for technological process extraction, processing, and transportation of mineral resources. The electrical power cost decreasing method by means of actual power quality factors (PQF) putting in accordance with GOST 13109-97 norms has been proved. The PQF continuous complex monitoring system structure and its basic designing principles, which allows to make commercial, technical and technological PQ control, have been offered and economically sounded.

Область исследования:
(Archived) Electric drive, power supply, automation and control of mining and oil and gas production
Funding:

None

Go to volume 178

Similar articles

Separation of drilled cylindrical billet from rock massif
2008 Yu. A. Eist, P. G. Talalay
Design and calculation methodology of double-circuit vertical belt conveyor for mining industry
2008 Yu. D. Tarasov
Method of integrity control of pipeline hydraulic transportation systems
2008 R. M. Proskuryakov, V. I. Malarev, N. V. Knyshov
Hydraulic coarseness of coal particles
2008 A. B. Nezametdinov
Belt conveyor with a suspended belt on sliding supports
2008 K. A. Vasiliev, A. K. Nikolaev
Influence of engine damping properties on dynamics of mechanical part of combine harvester
2008 A. S. Solov'ev, Ya. P. Grinberg, V. S. Solov'ev