Submit an Article
Become a reviewer
Vol 180
Pages:
181-185
Download volume:
RUS
Article

Selection of stripping parameters at use of environmental geotechnologies of steeply falling veins development

Authors:
G. V. Sabyanin
About authors
  • Institute for Problems of Integrated Subsoil Development, RAS
Date submitted:
2008-07-10
Date accepted:
2008-09-16
Date published:
2009-02-18

Abstract

In work the theoretical decision of a problem on completeness of dredging of curvilinear two-dimensional ore bodies is given by rectilinear explosive chinks and the design procedure of depth of chinks on conditions of a minimum of losses of not beaten off ore is offered.

Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Go to volume 180

Similar articles

Ways to optimize the parameters of drilling and blasting operations during mining of chambers of Maleevsky mine by the method of borehole charges on the basis of consideration of rock mass properties
2009 V. A. Artemov, S. V. Shcherbich
Basic provisions of calculation of explosion energy distribution fields in rock
2009 A. V. Shlyapin
Method of structural-geological forecast at processing of space images in the task of optimization of search for mineral deposits
2009 I. B. Movchan, A. A. Yakovleva
Installation of effective dust suppression at explosions and rock crushing
2009 I. V. Brigadin, A. G. Nesterov
Blasting technology in cryolithozone conditions
2009 P. N. Vasiliev, S. M. Tkach
Determination of zones of induced seismicity at development of Tashtagolskoye deposit
2009 A. V. Seryakov