Submit an Article
Become a reviewer
Vol 180
Pages:
181-185
Download volume:
RUS
Article

Selection of stripping parameters at use of environmental geotechnologies of steeply falling veins development

Authors:
G. V. Sabyanin
About authors
  • Institute for Problems of Integrated Subsoil Development, RAS
Date submitted:
2008-07-10
Date accepted:
2008-09-16
Date published:
2009-02-18

Abstract

In work the theoretical decision of a problem on completeness of dredging of curvilinear two-dimensional ore bodies is given by rectilinear explosive chinks and the design procedure of depth of chinks on conditions of a minimum of losses of not beaten off ore is offered.

Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Funding:

None

Go to volume 180

Similar articles

Ways to optimize the parameters of drilling and blasting operations during mining of chambers of Maleevsky mine by the method of borehole charges on the basis of consideration of rock mass properties
2009 V. A. Artemov, S. V. Shcherbich
Justification of preparation excavations fastening by combination of rod and rope anchor fasteners
2009 V. M. Shik, A. A. Romashkevich
Improvement of the technology of calculation of dangerous distances for rock pieces at mass explosions at quarries
2009 A. V. Zharovkin
Program of calculation of rock breakage at ore stripping by two-stage blocks
2009 N. N. Kazakov
Installation of effective dust suppression at explosions and rock crushing
2009 I. V. Brigadin, A. G. Nesterov
Increase of explosion efficiency of underwater bottom charges by changing the relative depth of charge immersion
2009 Dam Chong Tkhang