Submit an Article
Become a reviewer
Vol 180
Pages:
143-147
Download volume:
RUS
Article

Experience of using emulsion compositions and optimization of BVR parameters during stripping of overburden and kimberlites at the quarry of the Yubileynaya pipe of Aikhal Mining and Processing Division

Authors:
V. F. Kostyrin
About authors
  • Aikhal Mining and Processing Division of Alrosa
Date submitted:
2008-07-12
Date accepted:
2008-09-30
Date published:
2009-02-18

Abstract

In work experience of use emulsion explosives and is submitted to optimization of parameters of chisel and explosive works at breaking stripping overburden breeds and kimberlite on career «Anniversary». Application emulsion explosives allow: completely to mechanize process charging chinks; to provide full explosion safety at preparation of components and their transportation in quarry; to lower environmental contamination, it is essential to lower expenses on chisel and explosive works.

Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Funding:

None

Go to volume 180

Similar articles

Increase of efficiency and safety of mining works at management of mountain pressure by filling of the excavated space
2009 S. A. Tolstunov
Justification of preparation excavations fastening by combination of rod and rope anchor fasteners
2009 V. M. Shik, A. A. Romashkevich
Elastoplastic problem about stretching of a plane with a circular hole
2009 G. N. Zhurov, V. N. Kovalevskiy
Determination of rational parameters of foam plastic elements for creation of air spaces of borehole charges
2009 A. V. Leshchinskiy, E. B. Shevkun
Regularities of reaction of aquatic communities to technogenic impact
2009 D. S. Petrov
Blasting technology in cryolithozone conditions
2009 P. N. Vasiliev, S. M. Tkach