Installation of effective dust suppression at explosions and rock crushing
About authors
- 1 — SIC 26 Central Research Institute of the Ministry of Defense of the Russian Federation
- 2 — OJSC Granit-Kuznechnoye
Abstract
The circuit and structure of the equipment on suppression of a dust are proved at explosive works and crushing of rocks. Use in an alternating mode different polarity liquids allows to raise (increase) essentially efficiency suppression of a dust.
References
- Битколов Н.З. Аэрология карьеров / Н.З.Битколов, И.И.Медведев. М.: Недра, 1992.
- Гончаров С.А. Оценка электростатического заряда пылевых частиц, образующихся при добыче железистых кварцитов // Горный журнал. 2002. № 7.
- Пат. № 2273738 РФ. Способ пылеподавления при взрывных работах / И.В.Бригадин, А.Г.Нестеров. 2006.
Similar articles
Determination of zones of induced seismicity at development of Tashtagolskoye deposit
2009 A. V. Seryakov
Justification of technological solutions for underground development of copper and cauldron deposits of the Urals
2009 E. Yu. Meshcheryakov
Obtaining of peat products at drying in spreading and on slopes of multi-cycle build-up rolls
2009 A. N. Vasiliev, R. M. Kozlov