Abstract

The experience of supporting roof with bolts is mainly based on practical approach – hi and miss method. The theory of such support is descriptive than mathematical. Taking into account the complexity of mining – geological and mining technical conditions of underground mining it’s quite difficult to mathematically describe the destruction of entries roofs supported by bolts. Nevertheless even the quality identification of the factors causing roofs fall can give grounds to make plan of bracing and safety increase.

Область исследования:
(Archived) Geotechnology
Go to volume 180

Similar articles

Development of effective methods of reclamation of highly toxic technogenic massifs of enterprises of mineral and raw materials complex
2009 M. A. Pashkevich, D. S. Korelskyi
Mobile emulsion preparation plant MEF
2009 Wan Syui-Guan, Syun Daiyui, Gun Bin, Li Gochzhun, Shi Venlyan, Zhen Bin
Dust control at coal enterprises of the North
2009 Yu. V. Shuvalov, A. N. Nikulin, N. A. Gasparyan, Yu. D. Smirnov
Installation of effective dust suppression at explosions and rock crushing
2009 I. V. Brigadin, A. G. Nesterov
Ways to optimize the parameters of drilling and blasting operations during mining of chambers of Maleevsky mine by the method of borehole charges on the basis of consideration of rock mass properties
2009 V. A. Artemov, S. V. Shcherbich
Increase of explosion efficiency of underwater bottom charges by changing the relative depth of charge immersion
2009 Dam Chong Tkhang