Reconstruction of vertical shaft of Uzelginsky mine

Authors:
D. E. Zhurov
About authors
  • Shakhty Institute of South Russian State Technical University (Novocherkassk Polytechnic Institute)
Date submitted:
2008-08-17
Date accepted:
2008-10-27
Date published:
2009-02-01

Abstract

The paper studies details of the draft plan for skip shaft reconstruction at the Uzelginsky Ore Mine. Methods of loading chamber construction at the –340 m horizon and improvement of the shaft lining at the construction level are given a detailed description of.

Go to volume 181

References

  1. СНиП II-94-80. Подземные горные выработки / Госстрой СССР. М.: Стройиздат, 1982. 31 с.
  2. Булычев Н.С. Механика подземных сооружений: Учеб. для вузов. М.: Недра, 1994. 382 с.

Similar articles

Estimation of the level of maintainability of complex energy components under operating conditions
2009 I. I. Nikolaenkov
Research of influence of magnetic field on foaming properties of VKP reagent and flotation of graphite ore of different sites of Taiga deposit
2009 I. R. Masyagutova
Organization of mining works at preparation of new horizons at watered open pits
2009 I. I. Dudanov, V. S. Avraamov, D. N. Ligotsky, G. A. Kholodnyakov
Research of regularities of salt rocks strength change from conditions of occurrence
2009 A. Yu. Lytkina
Small speed asymptotic stability study of a speed vector control system for an induction motor that contains in its loop a Gopinath observer
2009 Olimpiu Stoicuta, Nadia Stoicuta, Teodor Pana
Prospects of development of ferrous metals of Polar and Subpolar Urals
2009 A. B. Anisimova