Reconstruction of vertical shaft of Uzelginsky mine
Authors:
About authors
- Shakhty Institute of South Russian State Technical University (Novocherkassk Polytechnic Institute)
Abstract
The paper studies details of the draft plan for skip shaft reconstruction at the Uzelginsky Ore Mine. Methods of loading chamber construction at the –340 m horizon and improvement of the shaft lining at the construction level are given a detailed description of.
References
- СНиП II-94-80. Подземные горные выработки / Госстрой СССР. М.: Стройиздат, 1982. 31 с.
- Булычев Н.С. Механика подземных сооружений: Учеб. для вузов. М.: Недра, 1994. 382 с.
Similar articles
Estimation of the level of maintainability of complex energy components under operating conditions
2009 I. I. Nikolaenkov
Research of influence of magnetic field on foaming properties of VKP reagent and flotation of graphite ore of different sites of Taiga deposit
2009 I. R. Masyagutova
Organization of mining works at preparation of new horizons at watered open pits
2009 I. I. Dudanov, V. S. Avraamov, D. N. Ligotsky, G. A. Kholodnyakov
Research of regularities of salt rocks strength change from conditions of occurrence
2009 A. Yu. Lytkina