Abstract

The paper studies details of the draft plan for skip shaft reconstruction at the Uzelginsky Ore Mine. Methods of loading chamber construction at the –340 m horizon and improvement of the shaft lining at the construction level are given a detailed description of.

Go to volume 181

References

  1. СНиП II-94-80. Подземные горные выработки / Госстрой СССР. М.: Стройиздат, 1982. 31 с.
  2. Булычев Н.С. Механика подземных сооружений: Учеб. для вузов. М.: Недра, 1994. 382 с.

Similar articles

Management of the process of purposeful creation of technogenic deposit of certain quality
2009 A. Ishimov, K. Drebenshtedt
Method of research of influence of deposit eccentricity on minimum current stripping volumes
2009 A. V. Polovinko, G. A. Kholodnyakov, D. G. Kholodnyakov
Waste space and its influence on the operation modes of the main ventilation fans
2009 N. N. Mokhirev, M. Yu. Postnikova
Monitoring on-line by the stability of the Кalman filter used in the vectorial control system for the speed of an induction motor
2009 Nadia Stoicuta, Olimpiu Stoicuta
Method of determination of friction coefficient at rolling of billets on crimping and thick plate mills
2009 M. V. Tsymbalyuk
Analysis of the system of state regulation of subsoil use
2009 A. S. Krasnaya