Submit an Article
Become a reviewer
Vol 181
Pages:
72-75
Download volume:
RUS
Article

Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure

Authors:
A. V. Rogachkov
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-14
Date accepted:
2008-10-12
Date published:
2009-03-20

Abstract

The article studies features of development gallery maintenance in zones of increased formation pressure in the Kuznetsk Coal Basin. Experience has been analyzed of applying the cable roof bolting in overworked development galleries in mining superimposed coal seams. Parameters of cable roof bolting have been determined which impact on its performance in conditions of increased formation pressure.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 181

Similar articles

Search of ways to increase technological indicators at processing of charge of rich and copper ores
2009 I. M. Zemenkov
Investigation of the influence of surfactants on the processes of electrorefining and hydro-aerosolization of nickel
2009 A. I. Ryabushkin
Improvement of the accounting organization in mining and metallurgical production in the conditions of transition to IFRS
2009 N. V. Mikhailova
Reconstruction of vertical shaft of Uzelginsky mine
2009 D. E. Zhurov
Research of regularities of salt rocks strength change from conditions of occurrence
2009 A. Yu. Lytkina
Automatic system of stabilization of sulphur production from waste gases of autogenous generators
2009 K. M. Botviniev