Peculiarities of maintenance of preparatory workings in the zones of increased mining pressure

Authors:
A. V. Rogachkov
About authors
  • G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-08-14
Date accepted:
2008-10-12
Date published:
2009-03-20

Abstract

The article studies features of development gallery maintenance in zones of increased formation pressure in the Kuznetsk Coal Basin. Experience has been analyzed of applying the cable roof bolting in overworked development galleries in mining superimposed coal seams. Parameters of cable roof bolting have been determined which impact on its performance in conditions of increased formation pressure.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 181

Similar articles

Electromechanical complex of equipment on the basis of hydrofied model plant
2009 E. G. Chernenko
Use of stochastic models for hydrodynamic analysis of water intakes operation
2009 Yu. P. Starodubova
Improvement of quality of manufacture of petrochemical devices and gas-oil pipelines by application of vibration treatment during welding
2009 O. F. Khafizova
Organization of mining works at preparation of new horizons at watered open pits
2009 I. I. Dudanov, V. S. Avraamov, D. N. Ligotsky, G. A. Kholodnyakov
Geoportal as a tool of territory management
2009 E. A. Shcherbatova
Justification of the parameters of the chamber and pillar system of development during the mining of declivity coal seams
2009 V. A. Shuklin