Submit an Article
Become a reviewer
Vol 182
Pages:
105-109
Download volume:
RUS
Article

Justification and selection of parameters of the device for destruction of oversized mines in underground conditions of De Beers mines

Authors:
M. S. Rodin
About authors
  • Student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-09-04
Date accepted:
2008-11-29
Date published:
2009-04-21

Abstract

The article is devoted to the necessity of expansion of non-blasting methods’ utilization for breaking the kimberlitic oversize in underground conditions of De Beers’ mines. The advantages of hydraulic hammers as executive device of mobile rock breaker are shown. The optimal ratio between weights of hammer piston and operating tool is chosen and substantiated.

Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Funding:

None

Go to volume 182

Similar articles

Experimental studies of the parallel active filter operation modes in the networks of Orenburgneft
2009 Yu. A. Sychev
Development of economic mechanism of stimulation of innovation activity of oil refining complex enterprises
2009 A. A. Shaidenko
Profiling of a hydro turbine grid for the drive of underwater mining machines
2009 N. A. Ekimov
Application of plasma aluminide coatings for increasing the reliability of operation of gas turbine engine blades
2009 I. D. Bulikin
Simulation modeling of the resonant electric drive of the reciprocating-rotating motion of the dynamically balanced drilling projectile on the load-carrying cable
2009 S. S. Staroded
Slaughtering electrode heat and steam generator for thermal methods of extraction of high-viscosity oil
2009 E. E. Melnikova