Simulation of the stress-strain state forming around the vertical mine in the field of tectonically fractured massif
Authors:
About authors
- Postgraduate student Sankt-Peterburgskii gosudarstvennyi gornyi institut (tekhnicheskii universitet)
Abstract
The influence of the front clean up of stress-strain state around a vertical mine of a tectonically fracture massif for a uranium deposit «Antey» is considered. By means of computer simulation it’s have been confirmed by field observations.
Область исследования:
(Archived) Problems in geomechanics of technologeneous rock mass
References
- Galaev N.Z. Modelling of heading-and-stall method by a method of equivalent materials with application dynamometrical bases // Proceedings of the Leningrad Mining institute. 1961. Volume XLIV. P.24-32.
- Dordzhiev D. Simulation of the deformation mode forming around the stope ore in the field of tectonically fractured massif // Challenges and solutions in mineral industry. Freiberg. 2009. P.159-164.
Similar articles
Evaluation and prediction of zones of inelastic deformations around mine workings
2010 V. D. Baryshnikov, L. N. Gakhova
Cycles of the Earth and Sun – the important factor оf activity of geodynamic processes at coal- and ore mines
2010 A. N. Shabarov, B. G. Tarasov
Organization and conduct of monitoring of geodynamic processes at the Grushovaya transshipment oil base of the Chernomortransneft Co
2010 A. P. Skakun