Control system for waste treatment of metallurgical works with use of membrane methods
Authors:
About authors
- Postgraduate student Saint Petersburg State Mining Institute (Technical University)
Abstract
In work considered application of baromembrane methods for waste treatment of metallurgical works, basic laws of baromembrane processes. On basis of adduced laws defined basic tasks of control system, mode of working and quality indexes of operation membrane complex.
Область исследования:
Metallurgy
Funding:
None
References
- Besekerskiy V.A., Popov E.P. Theory of automatic control system. Saint Petersburg: Profession, 2003. 752 р.
- Bredihin M.N. Membrane methods of water treatment // Innovations. Technologies. Solutions. 2007. № 7. P.20-23.
- Brok T. Membrane filtration. Moscow: World, 1987. 464 р.
- Vlasov K.P. Automatic control theory. Kharkov: Humanitarian center, 2006. 531 р.
- Ditnerskiy Yu.I. Baromembrane processes. Theory and Calculation. Moscow: Chemistry, 1986. 272 р.
- Povorov A.A., Pavlova V.F. Waste treatment of galvanic manufactures // Membranes. 1999. № 5. P.3-6.
- Kliyev A.S., Glasov B.V., Dubrovskiy A.H., Kliyev A.A. Projecting of automation system for technological processes: Handbook. Moscow: Energyatompublisher, 1990. 464 р.
- Shaposhnik V.A. Membrane methods of classification mixture // Educational journal of Soros, 1999. № 9. P.27-32,
Similar articles
Geotechnical engineering and hydrogeological specifics of estimate high-rise buildings construction and operation conditions (in terms of local zone on the right bank of Neva river)
2010 A. M. Zhukova
The North African campaign and its role in the World War II
2010 O. O. Tikhonov, K. V. Fedorov, O. Yu. Plenkov
Compensation of supply station reactive power by means of the mine main fan electric drive
2010 V. V. Sobolev, O. B. Shonin